ELE08-02969
| ELE-Aging Inspection | 7/2/2009 | 7/2/2009 | 7/6/2009 10:17:33 AM | | DONE |
|
|
no activity, suc
|
ESC07-00842
| General Inspection | 7/2/2009 | 7/2/2009 | 7/2/2009 3:42:58 PM | P | PASS |
|
|
did not see yellow sign, rest appears to be ok
|
ESC09-00021
| General Inspection | 7/2/2009 | 7/2/2009 | 7/2/2009 3:41:15 PM | P | PART |
|
|
did not see yellow sign, wating for sewer line to be installed, looked like in progress
|
ELE09-00923
| Final | 7/2/2009 | 7/2/2009 | 7/2/2009 3:38:15 PM | P | PASS |
|
|
darren Phone #: ###-#### ok to final
|
ELE09-00694
| Conference | 7/2/2009 | 7/2/2009 | 7/2/2009 3:23:04 PM | A | DONE |
|
|
met with contractor and other electrcal inspectors to review switchgear that did not have good instructions for gounding transformer, no esc this project
|
ESC09-00179
| General Inspection | 7/2/2009 | 7/2/2009 | 7/2/2009 2:45:55 PM | P | PASS |
|
|
looked ok
|
ESC08-00836
| General Inspection | 7/2/2009 | 7/2/2009 | 7/2/2009 2:11:11 PM | P | PASS |
|
|
looked ok, prepping for sod, told rp to keep sign posted
|
ELE09-01165
| Final | 7/2/2009 | 7/2/2009 | 7/2/2009 1:35:40 PM | P | PASS |
|
|
Late afternoon please. Randy ###-#### Phone #: ###-#### Internet Inspection Request from: Randy Fletcher ok to final, no esc this project
|
ELE09-01165
| Permanent Service | 7/2/2009 | 7/2/2009 | 7/2/2009 1:34:58 PM | P | PASS |
|
|
Late afternoon please. Randy ###-#### Phone #: ###-#### Internet Inspection Request from: Randy Fletcher p/s o/h rec ok, no esc this project
|
ELE09-01164
| Final | 7/2/2009 | 7/2/2009 | 7/2/2009 1:34:03 PM | P | PASS |
|
|
Mike Phone #: ###-#### ok to final, no esc this project
|
ELE09-01164
| Permanent Service | 7/2/2009 | 7/2/2009 | 7/2/2009 1:10:29 PM | P | PASS |
|
|
Mike Phone #: ###-#### p/s o/h rec ok, no esc this project
|
ELE09-01152
| Electrical Rough-In | 7/2/2009 | 7/2/2009 | 7/2/2009 12:40:24 PM | P | PASS |
|
|
Eupher Inspection Phone #: ###-#### Internet Inspection Request from: Ron Zimmerman ok to pour gec
|
ELE09-01161
| Electrical Rough-In | 7/1/2009 | 7/2/2009 | 7/2/2009 10:31:21 AM | A | PASS |
|
|
ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten called, ric ok, no esc this project, called structural to check on bld
|
ELE09-01135
| Permanent Service | 7/1/2009 | 7/2/2009 | 7/2/2009 10:03:48 AM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Robert Murray Inspection cancelled from web by: Robert Murray
|
ELE09-01143
| Temporary Service | 7/1/2009 | 7/2/2009 | 7/2/2009 9:52:32 AM | A | PASS |
|
|
dave Phone #: ###-#### called contractor, t/s o/h n ok, no esc this project
|
ELE09-00852
| Permanent Service | 7/1/2009 | 7/2/2009 | 7/2/2009 9:04:37 AM | A | PASS |
|
|
Brian Phone #: ###-#### called, left message, left survey, NEC 250.56 a single electrode that does not have 25 ohms or less resistance to ground shall be augmented by 1 additional electrode, p/s u/g n ok
|
ELE09-01147
| Electrical Rough-In | 7/1/2009 | 7/2/2009 | 7/2/2009 8:33:33 AM | A | PASS |
|
|
Jim is the onsite his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates ric ok top and bottom, no esc this project
|