Inspections for the day of: Friday, July 2, 2010.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00848 FIR-Aging Inspection7/2/20107/2/20107/6/2010 8:29:00 AM NR
Per Mike the tenant is waiting for funding to finish this project.
BLD10-01260 FIRE-Final Inspection7/2/20107/2/20107/2/2010 4:36:48 PMPFAIL
Tim is investigating the installation of an exit sign at the rear door with no landing and stephanie is investigating the partial alarm system. Single action door hardware needs to be provided as noted on the plans. All of the existing exit signs and emergency lights need to be repaired and tested.
FIR10-00287 INSP-Sprinkler Rough-in7/2/20107/2/20107/2/2010 4:34:08 PMPPASS
The tenting is acceptable. The sprinkler piping is ok to cover.
BLD10-00789 FIRE-Final Inspection7/1/20107/2/20107/2/2010 11:37:22 AMAPASS
Life safety passed.
BLD10-01423 FIRE-Final Inspection7/1/20107/2/20107/2/2010 11:00:42 AMAPASS
Life safety passed.
BLD09-00945 FIRE-Final Inspection7/1/20107/2/20107/2/2010 10:59:57 AMAPART
The phase 11 life safety passed.
FIR09-00611 INSP-Sprinkler Rough-in7/1/20107/2/20107/2/2010 10:36:27 AMAPART
Phase II sprinkler work is complete. We could not test the devices at the modified riser because of no access to the inspectors test in PoJo's and the correct orfice in the Dept. of Health/welfare was missing.
FIR09-00277 INSP-Final Inspection7/1/20107/2/20107/2/2010 10:07:19 AMPCANC
Give Randy a call ###-####. Inspection requested from web by: Mike Brown Phone #: ###-#### Inspection cancelled from web by: Mike Brown
FIR10-00280 INSP-Final Inspection7/1/20107/2/20107/2/2010 9:42:34 AMAPASS
Permit finaled
FIR10-00279 INSP-Final Inspection7/1/20107/2/20107/2/2010 9:41:55 AMAPASS
Permit finaled