BLD14-01133
| FIRE-Final Inspection | 7/2/2014 | 7/2/2014 | 7/2/2014 5:20:55 PM | P | PASS |
|
|
Scope of work completed. Fire life safety finaled. *Noted missing fire sprinkler coverage at a communications room adjacent to the remodel area- notified tenant. Forward information to fire prevention officer.
|
FIR14-00247
| INSP-Sprinkler Rough-in | 7/2/2014 | 7/2/2014 | 7/2/2014 5:10:13 PM | P | PART |
|
|
|
BLD14-01173
| FIRE-Final Inspection | 7/2/2014 | 7/2/2014 | 7/2/2014 5:09:42 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
FIR14-00217
| INSP-Final Inspection | 7/1/2014 | 7/2/2014 | 7/2/2014 2:53:18 PM | P | PART |
|
|
Walkthrough completed for the 2nd floor meeting room fire sprinkler finish work.
|
FIR13-00440
| INSP-Final Inspection | 7/1/2014 | 7/2/2014 | 7/2/2014 2:51:47 PM | P | PART |
|
|
Verified seismic bracing at the basement level 2 1/2" main north side.
|
FIR14-00134
| INSP-Final Inspection | 7/2/2014 | 7/2/2014 | 7/2/2014 12:45:43 PM | A | PASS |
|
|
Fire alarm work passed inspection. Permit finaled.
|
FIR14-00368
| INSP-Sprinkler Rough-in | 7/1/2014 | 7/2/2014 | 7/2/2014 11:32:50 AM | A | PART |
|
|
Overhead fire sprinkler modifications at the new cart storage wall okayed for cover.
|
BLD14-01336
| FIRE-Final Inspection | 7/1/2014 | 7/2/2014 | 7/2/2014 11:30:46 AM | A | PASS |
|
|
Verified previous correction items for completion. Door hardware okayed per plan review notes and structural inspector.
|