Inspections for the day of: Wednesday, July 2, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-01133 FIRE-Final Inspection7/2/20147/2/20147/2/2014 5:20:55 PMPPASS
Scope of work completed. Fire life safety finaled. *Noted missing fire sprinkler coverage at a communications room adjacent to the remodel area- notified tenant. Forward information to fire prevention officer.
FIR14-00247 INSP-Sprinkler Rough-in7/2/20147/2/20147/2/2014 5:10:13 PMPPART
BLD14-01173 FIRE-Final Inspection7/2/20147/2/20147/2/2014 5:09:42 PMPPASS
Fire life safety inspection passed.
FIR14-00217 INSP-Final Inspection7/1/20147/2/20147/2/2014 2:53:18 PMPPART
Walkthrough completed for the 2nd floor meeting room fire sprinkler finish work.
FIR13-00440 INSP-Final Inspection7/1/20147/2/20147/2/2014 2:51:47 PMPPART
Verified seismic bracing at the basement level 2 1/2" main north side.
FIR14-00134 INSP-Final Inspection7/2/20147/2/20147/2/2014 12:45:43 PMAPASS
Fire alarm work passed inspection. Permit finaled.
FIR14-00368 INSP-Sprinkler Rough-in7/1/20147/2/20147/2/2014 11:32:50 AMAPART
Overhead fire sprinkler modifications at the new cart storage wall okayed for cover.
BLD14-01336 FIRE-Final Inspection7/1/20147/2/20147/2/2014 11:30:46 AMAPASS
Verified previous correction items for completion. Door hardware okayed per plan review notes and structural inspector.