Inspections for the day of: Wednesday, July 2, 2014.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE14-01295 Electrical Rough-In7/1/20147/2/20147/2/2014 3:28:05 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Jerry Moore rough-in ok cover walls only Two runs of 3/4 FMC need pull boxes installed before ceiling inspection
ELE14-01659 Electrical Rough-In7/2/20147/2/20147/2/2014 3:24:00 PMPPASS
kevin Phone #: ###-#### rough-in ok cover addition
ELE14-01449 Final7/2/20147/2/20147/2/2014 2:14:05 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Lee VanSchoiack final ok
ELE14-00775 Electrical Rough-In7/1/20147/2/20147/2/2014 1:51:53 PMPPASS
Underground cover in court yard. Toby is the contact. Phone #: ###-#### >> Inspection requested via web by Buster Bowen Rough-in ok cover underground and ceiling grid in radiology
ELE14-01775 Electrical Rough-In7/1/20147/2/20147/2/2014 1:29:27 PMPPASS
Max-late PM if possible-underground Phone #: ###-#### rough-in ok cover seven (underground) UL listed floor boxes
ELE14-01701 Rough-In Permanent Service7/2/20147/2/20147/2/2014 1:10:58 PMPPASS
Phone #: ###-#### >> Inspection requested via web by daniel bibikov rough-in p/s u/g n ok 4 plex
ELE13-01605 Electrical Rough-In7/1/20147/2/20147/2/2014 10:47:32 AMAFAIL
Javier Phone #: ###-#### sub panel requires main breaker with tie down, still have nail plate and 1 1/4 issues
ELE14-01478 Final7/1/20147/2/20147/2/2014 10:34:42 AMANH
Final on kitchen remodel, any questions call ###-#### Phone #: ###-#### >> Inspection requested via web by Andy Rose No access nobody answering door
ELE14-01697 Final7/2/20147/2/20147/2/2014 9:40:28 AMAPASS
Danny is the contact. Phone #: ###-#### >> Inspection requested via web by Buster Bowen final ok
ELE14-01783 Conference7/1/20147/2/20147/2/2014 9:34:22 AMADONE
SERVICE Phone #: ###-#### >> Inspection requested via web by Kevin Burke Discussed with electrical contractor more than one service drop to an commerial building (differant voltage) Install service locations placard.
ELE13-03400 Final7/1/20147/2/20147/2/2014 8:48:16 AMAPASS
Kent Phone #: ###-#### final ok
ELE14-01771 Rough-In Permanent Service7/1/20147/2/20147/2/2014 8:26:56 AMAPASS
3 story across alley from previous inspections. SouthWest end. Phone #: ###-#### >> Inspection requested via web by Heath Thomas rough-in p/s u/g n ok