PLM17-03848
| PLM-Aging Inspection | 7/2/2018 | 7/2/2018 | 7/2/2018 3:54:55 PM | | NR |
|
|
contractor to schedule
|
PLM17-03845
| PLM-Aging Inspection | 7/2/2018 | 7/2/2018 | 7/2/2018 3:54:19 PM | | DEFR |
|
|
Contractor to schedule
|
PLM18-02780
| Plumbing Rough-in | 7/2/2018 | 7/2/2018 | 7/2/2018 3:50:30 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Andrew Wilde
|
PLM18-02779
| Plumbing Rough-in | 7/2/2018 | 7/2/2018 | 7/2/2018 3:50:18 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Andrew Wilde
|
PLM18-02778
| Plumbing Rough-in | 7/2/2018 | 7/2/2018 | 7/2/2018 3:50:06 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Andrew Wilde. DWV test failed
|
PLM18-00613
| Final | 7/2/2018 | 7/2/2018 | 7/2/2018 3:08:58 PM | P | PART |
|
|
Anthony Phone #: ###-####
|
PLM17-04672
| Final | 7/2/2018 | 7/2/2018 | 7/2/2018 3:08:16 PM | P | PART |
|
|
Anthony Phone #: ###-####
|
PLM18-02553
| Water Heater Final | 6/29/2018 | 7/2/2018 | 7/2/2018 1:51:02 PM | P | PASS |
|
|
Please call ###-#### when on way Phone #: ###-#### Inspection requested via web by JEREMY LINK
|
PLM18-02715
| Water Heater Final | 6/27/2018 | 7/2/2018 | 7/2/2018 1:22:00 PM | A | FAIL |
|
|
Please call Dennis at ###-#### when on way Phone #: ###-#### Inspection requested via web by JEREMY LINK. The t&p must be turned down. It cannot point straight out.
|
PLM18-02679
| Final | 6/29/2018 | 7/2/2018 | 7/2/2018 11:20:37 AM | A | FAIL |
|
|
Backflow was tested and passed by Pacific Backflow. Phone #: ###-#### Inspection requested via web by McKenna Haycock. 1. The double check valve is not an approved backflow assembly for irrigation per ISPC. Any backflow assembly that is changed out must be brought up to code. 2. PVC male fitting must be a minimum of schedule 80. ISPC 605.12.3
|
PLM18-01162
| Final | 6/29/2018 | 7/2/2018 | 7/2/2018 10:54:54 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Baker. 1. The t&p and pan drains are trapped in the crawl. 2. Locate the irrigation backflow assembly. It must be to code and certified by code.
|
PLM18-02769
| Water and/or Sewer | 6/29/2018 | 7/2/2018 | 7/2/2018 10:16:57 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Michael Klaas.. 1. The tracer wire must extend above grade. 2. The double check valve must be certified. 3. Provide access to the crawl.
|
PLM18-00346
| Final | 7/2/2018 | 7/2/2018 | 7/2/2018 10:00:31 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. The water is off to all the units. Label all the unit shut-off valves with unit numbers. All the irrigation rp to your permit or the irrigation contractor must pull a permit. Have certifed for final.
|
PLM17-02944
| PLM-Aging Inspection | 7/2/2018 | 7/2/2018 | 7/2/2018 9:22:36 AM | | PASS |
|
|
|
PLM17-02944
| DOC - Permit Expired | 7/2/2018 | 7/2/2018 | 7/2/2018 9:22:17 AM | A | PASS |
|
|
Contractor failed to schedule or follow up
|
PLM18-02605
| Final | 6/29/2018 | 7/2/2018 | 7/2/2018 9:21:04 AM | A | FAIL |
|
|
Please give our technician Anthony a call when you are on your way so he can let you in (If the door is not open) Phone #: ###-#### Inspection requested via web by Ben Davis. Install temperature limiting devices/device per ISPC 413.1
|