MEC18-03041
| Final | 6/27/2018 | 7/2/2018 | 7/2/2018 4:01:38 PM | P | PASS |
|
|
INSTALLER ARCHIE ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace ac coil co ok
|
MEC18-03118
| Final | 6/29/2018 | 7/2/2018 | 7/2/2018 3:01:49 PM | P | PASS |
|
|
Please inspect in the PM. Call on way Brett ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- ac coil co ok
|
MEC18-02997
| Final | 6/28/2018 | 7/2/2018 | 7/2/2018 2:35:34 PM | P | PASS |
|
|
Please inspect after 2 PM if possible. Saleha Abdul-Khamid ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace co ok
|
MEC18-03024
| Final | 6/27/2018 | 7/2/2018 | 7/2/2018 2:05:17 PM | P | PASS |
|
|
Please call Kyle to ensure install is complete. ###-#### Thank you! Phone #: ###-#### Inspection requested via web by Rick Borg - ac coil ok- co ok
|
MEC18-02124
| Final | 6/28/2018 | 7/2/2018 | 7/2/2018 1:42:03 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- line set has rips that need fixed with tape- line set needs UV protection- ductblast ok- airbalance report ok- Man J. and outdoor unit match
|
MIS18-00251
| MEC-Conference | 6/29/2018 | 7/2/2018 | 7/2/2018 12:54:47 PM | A | CANC |
|
|
monday early afternoon - cancelled Justin didnt answer phone call so i left him a message
|
MEC18-02464
| Final | 6/29/2018 | 7/2/2018 | 7/2/2018 12:52:43 PM | P | PASS |
|
|
LATE PM ISPECTION IF POSSIBLE PLEASE THANK YOU Phone #: ###-#### Inspection requested via web by Aaron Alandt- ManJ. ok- duct blast ok- air balance ok- furnace ac coil co ok
|
MEC18-02716
| Final | 6/28/2018 | 7/2/2018 | 7/2/2018 11:42:05 AM | A | PASS |
|
|
Please call Mary Ellen Kalange prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace ac coil co ok
|
PLM18-02768
| Final | 7/2/2018 | 7/2/2018 | 7/2/2018 11:20:49 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- water heater final ok
|
MEC18-02984
| Final | 6/29/2018 | 7/2/2018 | 7/2/2018 11:07:33 AM | A | PASS |
|
|
CAN YOU CALL WHEN YOU ARE ON THE WAY ###-#### CUSTOMERS NAME IS ERIC Phone #: ###-#### Inspection requested via web by Marisa Hone- Furnace ac coil co ok
|
MEC18-03046
| DOC - Permit Finaled | 7/2/2018 | 7/2/2018 | 7/2/2018 10:46:15 AM | P | PASS |
|
|
fireplace final ok- mantel height ok -gas flex into firplace and shut off valve ok
|
MEC18-03046
| Pressure Test | 6/29/2018 | 7/2/2018 | 7/2/2018 10:45:22 AM | A | PASS |
|
|
Kathy Stuart Phone #: ###-#### Inspection requested via web by Sheldon Lebow- 20lb gas pressure test ok- R/I ok- final ok
|
MEC18-02974
| Final | 6/29/2018 | 7/2/2018 | 7/2/2018 10:29:32 AM | A | PASS |
|
|
This is a Flue Pressure and Final Inspect. Please meet our installer at home at 10 AM . Contact for Right Now is Mary ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- 5lb flue pressure test ok- furnace ac coil co ok
|
MEC18-02951
| Final | 6/29/2018 | 7/2/2018 | 7/2/2018 9:42:35 AM | A | FAIL |
|
|
please call homeowner Louis when 30 mins in route Phone #: ###-#### Inspection requested via web by Rick Montgomery- gasline needs to be hard piped from manifold out of furnace cabinet cant be flex pipe- need to witness a 5lb flue pressure test- need inert tape on gasline penetration outside
|
MEC17-05401
| Rough-in | 6/29/2018 | 7/2/2018 | 7/2/2018 9:17:25 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 1 st floor R/I ok returns are done and insulated- linesets are done and insulated- ok for ceiling tile
|
MEC17-02006
| Mec-Aging Inspection | 7/2/2018 | 7/2/2018 | 7/2/2018 8:49:21 AM | | DONE |
|
|
called Value Heating and Air they didnt answer so i left a message. Dan called back and said he would work on getting the final scehduled
|