BLD18-01425
| FIRE-Conference | 7/2/2019 | 7/2/2019 | 7/2/2019 1:47:03 PM | P | DONE |
|
|
The superintendant and I went over basic requirements for fire loading the building.
|
FIR18-00525
| INSP-Sprinkler Rough-in | 7/1/2019 | 7/2/2019 | 7/2/2019 1:07:58 PM | P | PASS |
|
|
The second floor piping rough-in is complete. Piping can be covered. Piping for the clouds in the entry lobby not complete.
Todd Ketterling is the contact for this RTC inspection, he is requesting it on the 2nd floor. He is hoping for and early PM appointment. Thank you for your help and time. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00386
| INSP-Sprinkler Rough-in | 7/2/2019 | 7/2/2019 | 7/2/2019 11:49:52 AM | P | PASS |
|
|
Underground supply rough-in passed. Piping is ok for cover.
Bryan Collins is the contact. He would like this inspection as soon as possible today. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00215
| INSP-Final Inspection | 7/1/2019 | 7/2/2019 | 7/2/2019 11:27:56 AM | A | PART |
|
|
Todays inspection was just for the six north end apartments, two canopies need installed and one side wall adjusted as discussed.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|