BLD19-01616
| BLD-Footing | 7/2/2019 | 7/2/2019 | 7/2/2019 5:04:10 PM | P | PASS |
|
|
inspection for rebar placed in pool in back yard. All plans and permits are on site in a PVC pipe secured to a T post. Phone #: ###-#### Inspection requested via web by Brandy McConkey
|
BLD18-02733
| BLD-Framing/Rough-in | 7/2/2019 | 7/2/2019 | 7/2/2019 5:03:58 PM | P | PART |
|
|
Verify Strong Wall (North East side, Garage) anchoring... As per walk through- fire block furred basement wall and landings...
|
BLD18-00772
| BLD-Footing | 7/2/2019 | 7/2/2019 | 7/2/2019 5:01:50 PM | P | DEFR |
|
|
Refer to BLD18-01815 for New constrution permit...
|
BLD18-01815
| BLD-Footing | 7/2/2019 | 7/2/2019 | 7/2/2019 5:00:28 PM | P | PASS |
|
|
See permit BLD18- 0072 for previous inspections- basement footing and foundation... Footing inspection for revised floor plan...
|
BLD18-04240
| BLD-Framing/Rough-in | 7/1/2019 | 7/2/2019 | 7/2/2019 12:41:00 PM | A | PASS |
|
|
Brian Phone #: ###-####
|
BLD19-00514
| BLD-Energy code compliance | 7/1/2019 | 7/2/2019 | 7/2/2019 12:40:51 PM | A | PASS |
|
|
Les Phone #: ###-####
|
BLD19-00283
| BLD-Footing | 7/1/2019 | 7/2/2019 | 7/2/2019 12:40:26 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD19-01921
| BLD-Framing/Rough-in | 7/1/2019 | 7/2/2019 | 7/2/2019 12:40:14 PM | A | PASS |
|
|
Please give us a 15 minute warning so we can be present for the inspection. Once this inspection is complete we will finish the air seal and insulation to prepare for the energy inspection. Phone #: ###-#### Inspection requested via web by Dustin Collins
|