BLD20-02215
| BLD-Final | 7/1/2020 | 7/2/2020 | 7/2/2020 4:57:09 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Tennant. Noted that roof repair could not be completed due to 3 layers of shingles already in place. A non compliant item can not be repaired.
|
BLD18-04521
| BLD-Final | 7/1/2020 | 7/2/2020 | 7/2/2020 4:19:05 PM | P | NR |
|
|
Building Final inspection Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD20-01599
| BLD-Final | 7/1/2020 | 7/2/2020 | 7/2/2020 4:18:24 PM | P | DONE |
|
|
Onsite contact: Mierins ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
|
BLD20-01599
| DOC - Permit Finaled | 7/2/2020 | 7/2/2020 | 7/2/2020 4:18:17 PM | P | PASS |
|
|
|
BLD20-02215
| DOC - Permit Finaled | 7/2/2020 | 7/2/2020 | 7/2/2020 4:18:08 PM | P | PASS |
|
|
|
BLD20-00308
| BLD-Framing/Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 2:18:46 PM | P | FAIL |
|
|
Kyle Phone #: ###-####. Needs to provide updated strucutural details for steel studs in lieu of LVL studs for exterior furouts. Need special inspection reports for concrete and epoxy to date. Also needs to provide fire conferance on exterior furouts. Called Kyle at above number and left message. do not cover furouts at this time.
|
BLD20-01334
| BLD-Footing | 7/1/2020 | 7/2/2020 | 7/2/2020 2:16:28 PM | P | NR |
|
|
Pat *screened* Phone #: ###-####BAsement is still being excavated.
|
BLD20-00258
| BLD-Final | 7/2/2020 | 7/2/2020 | 7/2/2020 1:54:34 PM | P | PASS |
|
|
Call for Access Phone #: ###-#### Inspection requested via web by Allen Jones
|
BLD20-00258
| DOC - Permit Finaled | 7/2/2020 | 7/2/2020 | 7/2/2020 1:54:25 PM | P | PASS |
|
|
|
BLD19-04893
| BLD-Framing/Rough-in | 7/2/2020 | 7/2/2020 | 7/2/2020 1:13:44 PM | P | NH |
|
|
Muhamed - *Screened* Phone #: ###-####. Doors locked, no access. Also noted that the airseal pak needs to be completed prior to framing inspection.
|
BLD18-02618
| BLD-Framing/Rough-in | 7/2/2020 | 7/2/2020 | 7/2/2020 12:59:51 PM | P | PASS |
|
|
Kathlan *screened* Phone #: ###-####. Ok to insulate.
|
BLD20-01657
| BLD-Final | 6/30/2020 | 7/2/2020 | 7/2/2020 11:44:20 AM | A | NR |
|
|
Please call 30 minutes in advance Phone #: ###-#### Inspection requested via web by Chase Cheverton. Fire/life safety final has failed.
|
BLD20-00337
| BLD-Footing | 7/1/2020 | 7/2/2020 | 7/2/2020 9:26:10 AM | A | PART |
|
|
Screened // Chase Phone #: ###-####. Interior column pads and exterior footing in areas b and c. Ok to place pending special inspection.
|
BLD20-01669
| BLD-Footing | 7/1/2020 | 7/2/2020 | 7/2/2020 8:56:34 AM | A | PASS |
|
|
If you call 30 min before you arrive I can meet you at the project. Thanks ; have a great day Phone #: ###-#### Inspection requested via web by William Meyer
|
BLD20-02215
| BLD-Conference | 7/1/2020 | 7/2/2020 | 7/2/2020 8:38:27 AM | A | PASS |
|
|
striped all layers of existing material to bare deck per our discussion now need bare inspection prior to covering. Replaced the dry rotted 1x10 roof sheeting. Please come as early as possible repairs are completed as of Wednesday afternoon, shingles are on site. Thanks very much. Phone #: ###-#### Inspection requested via web by Scott Tennant
|
BLD20-01344
| BLD-Energy code compliance | 7/1/2020 | 7/2/2020 | 7/2/2020 8:24:55 AM | A | PASS |
|
|
Brad Phone #: ###-####
|
BLD19-04247
| BLD-Final | 7/1/2020 | 7/2/2020 | 7/2/2020 7:12:32 AM | P | CANC |
|
|
Final Inspections for carports Phone #: ###-#### >> Inspection requested via web by Kris Linnell Inspection cancelled from web by: Kris Linnell
|
BLD20-00376
| BLD-Other | 6/30/2020 | 7/2/2020 | 7/2/2020 12:00:00 AM | A | CANC |
|
|
masonory- special inspectors at 10:45am Jay *screened* Phone #: ###-####
|