Inspections for the day of: Friday, July 20, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-01630 Final7/19/20017/20/20017/20/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/19/2001 at 06:58:13. Contact: ###-####.
MEC01-02139 Final7/19/20017/20/20017/20/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/19/2001 at 12:03:49. Contact: ###-####.
MEC01-02138 Final7/19/20017/20/20017/20/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/19/2001 at 12:05:51. Contact: ###-####.
MEC01-02140 Final7/19/20017/20/20017/20/2001 12:00:00 AMAPASS
furnace a/c gas test ###-####
MEC01-02140 Pressure Test7/19/20017/20/20017/20/2001 12:00:00 AMAFAIL
###-#### c/n caulk ceiling and provide 20 psi. 7/20/2001 10:36:59 AM
BLD01-01324 BLD-Framing/Rough-in7/19/20017/20/20017/20/2001 12:00:00 AMAPART
Frank ###-#### reinspection nail 3 ply girder ok to insulate. 7/20/2001 10:37:25 AM
BLD01-00594 BLD-Framing/Rough-in7/19/20017/20/20017/20/2001 12:00:00 AMPNR
shear nailing reinspection Jim ###-####
BLD00-02809 BLD-Final7/20/20017/20/20017/20/2001 12:00:00 AMPFAIL
###-####. c/n posted also needs fire/life safety. 7/20/2001 3:33:01 PM
BLD00-02813 BLD-Framing/Rough-in7/20/20017/20/20017/20/2001 12:00:00 AMPFAIL
###-####c/n penetrations. 7/20/2001 3:33:45 PM
BLD01-00379 BLD-Foundation7/20/20017/20/20017/20/2001 12:00:00 AMPPART
RE-INFORCEMENT FOR THE FOUND- CHRIS ###-####. cmu ok also will be inspected by strata. 7/20/2001 3:24:10 PM
BLD01-00594 BLD-Framing/Rough-in7/20/20017/20/20017/20/2001 12:00:00 AMPNR
SHEAR\\###-####