BLD01-00774
| BLD-Framing/Rough-in | 7/19/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/19/2001 at 14:57:59. Contact: . C/N issued-ok to insulate 7/20/2001 9:22:04 AM
|
BLD01-01351
| BLD-Energy code compliance | 7/19/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | A | PART |
|
|
###-#### C/N issued--energy report required before issuance of c. of .c. ok to cover 7/20/2001 9:59:49 AM
|
BLD00-03604
| BLD-Final | 7/19/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | A | CANC |
|
|
reinspection Jane ###-#### cancelled by contractor 7/20/2001 7:51:25 AM
|
BLD01-01129
| BLD-Framing/Rough-in | 7/19/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | A | FAIL |
|
|
###-#### C/N--No approved plans or address 7/20/2001 10:10:11 AM
|
BLD01-00567
| BLD-Final | 7/19/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 420 On 7/19/2001 12:54:11 PM Contacted inspector 360, signed card based on his approval after verifing prior c/n items were corrected. 7/20/2001 11:21:41 AM
|
MEC01-01964
| Rough-in | 7/19/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/19/2001 at 14:27:11. Contact: ###-####.
|
MEC01-02096
| Rough-in | 7/19/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/19/2001 at 14:35:12. Contact: ###-####.
|
BLD00-03604
| BLD-Final | 7/20/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | P | PASS |
|
|
###-#### C. of C. #20459 issued; Provide energy and flood plain elevation reports. Flood plain from Quarant--(Steve Sweet). 7/20/2001 1:13:30 PM
|
BLD01-01741
| BLD-Foundation | 7/20/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | P | PART |
|
|
###-#### wip 7/20/2001 12:41:25 PM
|
MEC01-01614
| Final | 7/20/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/20/2001 at 08:35:25. Contact: ###-####. No access--hardwood floor sign -- c/n posted. 7/20/2001 2:22:23 PM
|
BLD01-01841
| BLD-Foundation | 7/20/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | P | PART |
|
|
###-#### wip 7/20/2001 3:07:50 PM
|
BLD01-01696
| BLD-Framing/Rough-in | 7/20/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | P | CANC |
|
|
metal stud ###-#### Cancelled by contractor--not ready. 7/20/2001 2:00:02 PM
|
MEC01-02130
| Final | 7/20/2001 | 7/20/2001 | 7/20/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/20/2001 at 11:12:10. Contact: ###-####.
|
MEC01-01630
| Final | 7/18/2001 | 7/20/2001 | 7/19/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 07/18/2001 at 18:49:54. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/19/2001 at 06:57:06.
|