Inspections for the day of: Thursday, July 20, 2006.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-00280 BLD-Aging Inspection7/20/20067/20/20067/24/2006 10:47:49 AM NR
BLD05-00422 BLD-Aging Inspection7/20/20067/20/20067/24/2006 10:47:31 AM NR
BLD06-01342 BLD-Final7/20/20067/20/20067/20/2006 4:17:18 PMPPASS
Scheduled by a contractor via Hello! on 7/20/2006 at 7:38:48 AM. Contact: ###-####.
BLD06-01342 DOC - Permit Finaled7/20/20067/20/20067/20/2006 4:17:08 PMPPASS
BLD05-00627 BLD-Aging Inspection7/20/20067/20/20067/20/2006 4:06:15 PM DONE
BLD06-00889 BLD-Final7/19/20067/20/20067/20/2006 4:03:52 PMPPASS
Scheduled by a contractor via Hello! on 7/19/2006 at 11:34:42 AM. Contact: ###-####. ok for perm occ.
BLD05-02671 BLD-Final7/19/20067/20/20067/20/2006 3:46:34 PMPFAIL
Scheduled by a contractor via Hello! on 7/19/2006 at 4:06:23 PM. Contact: ###-####. Needs public works sign off and to install code compliant handrail.
BLD05-01422 BLD-Final7/20/20067/20/20067/20/2006 3:22:40 PMPFAIL
anthony ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Needs continpous handrail, landings required on exterior side of main exit door.
MIS06-00180 BLD-Final7/20/20067/20/20067/20/2006 2:54:10 PMPPASS
Nathan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. ok for perm occ.
BLD06-01374 BLD-Final7/20/20067/20/20067/20/2006 2:44:54 PMPPASS
mike ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD06-01374 DOC - Permit Finaled7/20/20067/20/20067/20/2006 2:44:39 PMPPASS
BLD06-00170 BLD-Wall cover7/20/20067/20/20067/20/2006 2:33:06 PMPPART
Noted that remainder of inspections were completed along with bldg F (bld06-00169) noted on posted c/n that contractor needs to call in both permits for insp. Roof nailing and hardware ok. Exterior shear wall nailing ok. Simpson holddown straps not installed. c/n posted. ok to cover roof.
BLD06-00169 BLD-Framing/Rough-in7/19/20067/20/20067/20/2006 2:28:23 PMPPART
cameron sheer nailing; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Roof nailing and hardware ok. Shear nailing on exterior perimeter walls ok. Simpson holddown straps were not installed. c/n posted. ok to cover roof.
BLD06-01744 BLD-Footing7/20/20067/20/20067/20/2006 12:56:25 PMPPASS
jeff ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD04-03025 BLD-Framing/Rough-in7/20/20067/20/20067/20/2006 12:23:12 PMPCANC
Scheduled by a contractor via Hello! on 7/20/2006 at 8:56:23 AM. Contact: ###-####. contractor called and cancelled insp.
BLD06-00698 BLD-Wall cover7/19/20067/20/20067/20/2006 12:02:48 PMAPART
Scheduled by a contractor via Hello! on 7/19/2006 at 3:29:50 PM. Contact: ###-####. ok to insul. Repair notched ml in garage and add blocking to floor joist at cantilever sections.
BLD06-00842 BLD-Framing/Rough-in7/19/20067/20/20067/20/2006 11:14:45 AMAPART
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Inspected new 2hr seperation wall, at east end seperating east hangar from lobby area. Also verified 5/8 on bottom of roof deck for a distance of 4ft at east hangar. Contracot to supply spec shhets for hilti firecaulking for penetrations. Also noted that existing wall seperating the west hangar area from the office area will need to be replaced, will not meet 2hr. wall seperation requirements. Also inspected ceiling framing for new 2hr. ceiling.
BLD06-01813 BLD-Footing7/19/20067/20/20067/20/2006 10:21:53 AMAPASS
john ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD04-02464 BLD-Foundation7/19/20067/20/20067/20/2006 10:11:29 AMAPART
Tony, this is our stem wall inspection we are pouring concrete at noon thanks,todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns. Store front for Lees Candy was changed, Door shrunk and windows were moved . Exisiting verts at jambs no longer match changes. Contractor awaiting fix from structural engineer. Will have RFI from enginner for city and will get special insp. if any is required.
BLD06-00212 BLD-Concrete7/19/20067/20/20067/20/2006 9:30:16 AMAPART
Scheduled by a contractor via Hello! on 7/19/2006 at 9:22:21 AM. Contact: ###-####. work complete. did review special insp. reports. ok
BLD06-00212 BLD-Foundation7/19/20067/20/20067/20/2006 9:29:09 AMAPART
Scheduled by a contractor via Hello! on 7/19/2006 at 9:21:54 AM. Contact: ###-####. work complete. did review special insp reports. ok.
BLD06-00212 BLD-Footing7/19/20067/20/20067/20/2006 9:28:12 AMAPART
Scheduled by a contractor via Hello! on 7/19/2006 at 9:21:24 AM. Contact: ###-####. work complete. But reviewed special insp reports. ok.
BLD05-01422 BLD-Final7/19/20067/20/20067/20/2006 12:00:00 AMACANC
not ready per mirela. anthony ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie