ELE07-02241
| Electrical Rough-In | 7/20/2007 | 7/20/2007 | 7/20/2007 4:01:33 PM | P | PASS |
|
|
dan - wall cover; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang corrections made, ric walls and hard lids only ok to cover
|
ELE06-02801
| Final | 7/18/2007 | 7/20/2007 | 7/20/2007 3:16:13 PM | P | PASS |
|
|
jay Phone #: ###-#### ok to final
|
ELE07-01873
| Electrical Rough-In | 7/20/2007 | 7/20/2007 | 7/20/2007 2:35:55 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 7/19/2007 at 5:13:30 PM. Contact: ###-####. see conf, too much too do for ri
|
ELE07-01873
| Conference | 7/20/2007 | 7/20/2007 | 7/20/2007 2:35:38 PM | P | DONE |
|
|
Scheduled by a contractor via Hello! on 7/19/2007 at 5:13:30 PM. Contact: ###-####. met owner, explained stapling nm cable, make-up, not mixing 12 &14 off 20a bkr,
|
ELE07-02055
| Permanent Service | 7/18/2007 | 7/20/2007 | 7/20/2007 1:52:50 PM | P | PASS |
|
|
rick Phone #: ###-#### p/s u/g n ok
|
ELE07-02534
| Final | 7/20/2007 | 7/20/2007 | 7/20/2007 1:01:36 PM | P | CANC |
|
|
ouk; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang wrong type request, see ri
|
ELE07-02534
| Electrical Rough-In | 7/20/2007 | 7/20/2007 | 7/20/2007 1:01:23 PM | P | PASS |
|
|
ouk; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang ric ok, check for 15A breaker at final
|
ELE07-00848
| Final | 7/20/2007 | 7/20/2007 | 7/20/2007 12:37:35 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Robert Murray ok to final
|
ELE07-02302
| Electrical Rough-In | 7/19/2007 | 7/20/2007 | 7/20/2007 11:05:08 AM | A | PASS |
|
|
contact: Mark Knight - U/G inspection please Phone #: ###-#### Internet Inspection Request from: Deb Gooden ok to cover service conduit area
|
ELE07-01054
| Electrical Rough-In | 7/19/2007 | 7/20/2007 | 7/20/2007 10:40:14 AM | A | FAIL |
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang called, left corr notice, nec 300.11(A) individual support wires shall be secured at both ends. Cables and raceways shall not be supported by ceiling grids. 330.30(B) mc cable shall be secured within 12" of each termination
|
ELE07-02559
| Rough-In Permanent Service | 7/20/2007 | 7/20/2007 | 7/20/2007 9:57:45 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/20/2007 at 5:25:07 AM. Contact: ###-####. ric ok, p/s u/g n ok
|
ELE07-02558
| Rough-In Permanent Service | 7/20/2007 | 7/20/2007 | 7/20/2007 9:38:44 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/20/2007 at 5:24:08 AM. Contact: ###-####. ric ok, p/s u/g n ok
|
ELE07-02446
| Rough-In Permanent Service | 7/20/2007 | 7/20/2007 | 7/20/2007 9:15:05 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/20/2007 at 5:21:59 AM. Contact: ###-####. ric ok, p/s u/g n ok
|
ELE07-02447
| Rough-In Permanent Service | 7/20/2007 | 7/20/2007 | 7/20/2007 8:52:49 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/20/2007 at 5:23:02 AM. Contact: ###-####. ric ok, p/s u/g n ok
|
ELE07-01936
| Rough-In Permanent Service | 7/19/2007 | 7/20/2007 | 7/20/2007 8:26:14 AM | A | CANC |
|
|
Inspection of the ground for the change in permanent service before covering with concrete. Ted is the contact on site ###-#### Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa wrong type request, see ri
|
ELE07-01936
| Electrical Rough-In | 7/20/2007 | 7/20/2007 | 7/20/2007 8:25:59 AM | A | PASS |
|
|
Inspection of the ground for the change in permanent service before covering with concrete. Ted is the contact on site ###-#### Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa ok to pour gec anop will see rest ltr
|
ELE07-02451
| Conference | 7/20/2007 | 7/20/2007 | 7/20/2007 7:58:57 AM | A | DONE |
|
|
Temp Service inspect. Please Call Rick Sendra Phone #: ###-#### Internet Inspection Request from: Kristopher Wilson met contr, looked at equip, talked about what to do for code compliance, then to call for inspection
|
ELE07-01873
| Electrical Rough-In | 7/19/2007 | 7/20/2007 | 7/20/2007 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 7/19/2007 at 5:13:30 PM. Contact: ###-####. doing afternon inspection
|
ELE07-02544
| Electrical Rough-In | 7/20/2007 | 7/20/2007 | 7/20/2007 12:00:00 AM | P | DONE |
|
|
rick - pls call 30 mins prior ###-####.
|