BLD12-00926
| FIRE-Final Inspection | 7/20/2012 | 7/20/2012 | 7/20/2012 4:17:09 PM | P | FAIL |
|
|
The exit signs and emergency lights in the warehouse area need to be finished and tested. Plans need to be resubmitted showing the actual wall layout.
|
FIR12-00315
| INSP-Final Inspection | 7/20/2012 | 7/20/2012 | 7/20/2012 3:47:29 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00367
| INSP-Sprinkler Rough-in | 7/20/2012 | 7/20/2012 | 7/20/2012 3:29:12 PM | P | PASS |
|
|
The underground supply piping is ok to cover. Troy was finishing wrapping the galvanized FDC and stated he would also rotate the two outlets to face the street.
|
FIR12-00363
| INSP-Sprinkler Rough-in | 7/20/2012 | 7/20/2012 | 7/20/2012 2:42:08 PM | P | PASS |
|
|
Underground supply piping ok to cover as marked on the city approved plans with todays date.
|
FIR12-00343
| INSP-Sprinkler Rough-in | 7/19/2012 | 7/20/2012 | 7/20/2012 1:25:05 PM | P | PASS |
|
|
Sprinkler rough-in passed. One pendant head still needed to be installed. One pendant head shown to be installed in the main level restroom has not been installed and doesn't need to be based on NFPA 13R 6.6.2. Piping can not be covered until the insulation/tenting is completed and inspected. An additional inspection will be required for this.
|
FIR12-00330
| INSP-Sprinkler Rough-in | 7/19/2012 | 7/20/2012 | 7/20/2012 12:22:04 PM | A | PASS |
|
|
Underground supply piping, as marked on plan, is ok to cover.
|
FIR12-00342
| INSP-Sprinkler Rough-in/Hydro | 7/19/2012 | 7/20/2012 | 7/20/2012 11:49:27 AM | A | PASS |
|
|
Underground hydro passed with 216 psi on the guage.
|
BLD12-01812
| FIRE-Final Inspection | 7/19/2012 | 7/20/2012 | 7/20/2012 11:20:02 AM | A | PASS |
|
|
Life safety passed
|
FIR12-00289
| INSP-Sprinkler Rough-in | 7/19/2012 | 7/20/2012 | 7/20/2012 10:50:04 AM | A | PASS |
|
|
Sprinkler piping is ok to cover
|
BLD12-00725
| FIRE-Final Inspection | 7/19/2012 | 7/20/2012 | 7/20/2012 10:28:58 AM | A | PASS |
|
|
life safety passed
|
BLD11-01743
| FIRE-Final Inspection | 7/19/2012 | 7/20/2012 | 7/20/2012 10:28:18 AM | A | PASS |
|
|
life safety passed
|
BLD12-01369
| FIRE-Final Inspection | 7/19/2012 | 7/20/2012 | 7/20/2012 9:03:36 AM | A | PASS |
|
|
Fire life safety passed. Exit sign has been repaired.
|
FIR12-00350
| INSP-Final Inspection | 7/19/2012 | 7/20/2012 | 7/20/2012 8:58:04 AM | A | PASS |
|
|
Permit finaled
|
FIR12-00354
| INSP-Final Inspection | 7/19/2012 | 7/20/2012 | 7/20/2012 8:29:53 AM | A | FAIL |
|
|
Ceiling tile has not be installed yet but piping is ok to cover. Actual suite number is 150.
|
FIR12-00363
| INSP-Sprinkler Rough-in | 7/19/2012 | 7/20/2012 | 7/20/2012 8:07:05 AM | A | FAIL |
|
|
Underground Inspection failed due to no approved plans on site and I noted that the underground supply piping only has 3'-10" of cover which does not meet the minimum 4'-6" requirement.
|