FIR15-00378
| INSP-Sprinkler Rough-in | 7/20/2015 | 7/20/2015 | 7/20/2015 3:11:18 PM | P | PASS |
|
|
Inspected remaining area's associated with this permit, rough-in inspection passed/complete, all area's associated with this FIR approved for cover.
|
FIR15-00439
| INSP-Sprinkler Rough-in | 7/20/2015 | 7/20/2015 | 7/20/2015 3:08:39 PM | P | PASS |
|
|
Rough-in inspection passed/complete, approved for cover
|
BLD15-01569
| FIRE-Final Inspection | 7/20/2015 | 7/20/2015 | 7/20/2015 1:00:29 PM | P | PASS |
|
|
Life safety passed/complete
|
FIR14-00225
| INSP-Conference | 7/17/2015 | 7/20/2015 | 7/20/2015 10:35:59 AM | P | CANC |
|
|
Spoke with point of contact, Tony with Shilo Fire Protection, Phone #: ###-####. Conference was for JUMP project, not Zions Bank Building 7th floor. Cancelled this consult per conversation with Tony, not the correct location or FIR number, will call for a reschedule with correct FIR number.
|
FIR15-00419
| INSP-Final Inspection | 7/17/2015 | 7/20/2015 | 7/20/2015 10:28:44 AM | P | CANC |
|
|
Duplicate inspection, already inspected, passed/complee
|
BLD15-01373
| FIRE-Final Inspection | 7/17/2015 | 7/20/2015 | 7/20/2015 8:12:23 AM | A | PASS |
|
|
Previously noted items corrected, approved drawings with small documents on site, discharge egress lights installed, Life fire safety passed/complete
|