InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00900 INSP-Sprinkler Rough-in7/20/20167/20/20167/20/2016 3:41:01 PMPPART
Hydrostatic test complete for level 2 and level 3 overhead fire sprinkler piping. Overhead fire sprinkler piping on level 1 approved for cover. Overhead fire sprinkler piping that is between level 2 and level 3 living area's approved for cover. Fire sprinkler piping that is located between the roof deck & livings area's on level 2 and level 3 cannot be covered until a tenting inspection has been completed. Any piping in these area's that gets covered before tenting inspection is complete will have cover material removed to verify that tenting insulation has been installed..
BLD16-02087 FIRE-Final Inspection7/20/20167/20/20167/20/2016 2:45:04 PMPPASS
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in common area's with current inspection tags. Final life fire safety inspection passed/complete.
FIR16-00040 INSP-Sprinkler Rough-in/Hydro7/19/20167/20/20167/20/2016 2:25:12 PMPPART
Partial rough to cover inspection for underground supply main that is on the east side of building running north to south complete, area's inspected approved for cover, area that will be inspected at a later date is the remaining underground running north to south on the northeast side of building.
BLD16-01364 FIRE-Conference7/20/20167/20/20167/20/2016 10:43:09 AMPDONE
Fire conference complete
BLD15-04136 FIRE-Final Inspection7/19/20167/20/20167/20/2016 10:08:56 AMACANC
Inspection request will need to be rescheduled to coincide with FIR permit final.
FIR15-00806 INSP-Sprinkler Rough-in/Hydro7/20/20167/20/20167/20/2016 10:05:58 AMPPASS
Hydrostatic test for overhead fire sprinkler piping complete.
FIR15-00806 INSP-Sprinkler Rough-in7/20/20167/20/20167/20/2016 10:04:26 AMPPART
Rough to cover inspection complete for overhead fire sprinkler piping, fire sprinkler piping not located in attic space approved for cover. Overhead fire sprinkler piping located in attic area's cannot be covered until tenting inspection has been completed.
FIR16-00311 INSP-Sprinkler Rough-in7/19/20167/20/20167/20/2016 9:26:38 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping located by the cook prep area complete, overhead fire sprinkler piping approved for cover.
BLD16-02116 FIRE-Final Inspection7/19/20167/20/20167/20/2016 9:15:30 AMAPASS
No fire sprinklers, smoke/carbon monoxide detectors are in place (not monitored, alarm system is stand alone), fire extinguishers are in place and will be tagged with current inspection tags, door hardware is existing (round type door handles, thumbturn deadbolts). Final life fire safety inspection passed/complete.
FIR16-00327 INSP-Sprinkler Rough-in7/19/20167/20/20167/20/2016 8:36:36 AMAPASS
Rough to cover inspection for overhead fire sprinkler located in the basement for this scope of work complete, overhead fire sprinkler piping located in basement level approved for cover.