Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01004 General Inspection7/20/20177/20/20177/24/2017 9:41:55 AM CANC
ESC15-01138 General Inspection7/20/20177/20/20177/21/2017 2:31:02 PM CANC
ESC16-01233 Site Final7/20/20177/20/20177/21/2017 8:18:28 AMPNR
Work complete and disturbed has had sod installed for stabilization.

Need to remove DI protection installed 100 meters down access road.
ESC15-00957 General Inspection7/20/20177/20/20177/20/2017 1:53:07 PM CANC
ESC17-00814 Complaint Inspection7/20/20177/20/20177/20/2017 1:43:51 PMPPASS
Dust complaint.

No fugitive dust observed. Demolition of foundation and basement is in progress. Demo contractor is using sprinkler to control dust and running it in advance of excavating into material. Ground was visibly wet. He did state that Intermountain Gas crew was doing work in the alley earlier in morning and created some dust.

Project has been abated for any hazardous contents (ie asbestos; lead). No trackout of materials, no offiste discharges of dust control water. Site vegetatation and sidewalks preserved around work area.

Site appears to be in compliance. Reminded demo man and developer that dust control is a priority and is required.
ESC13-00764 Site Final7/20/20177/20/20177/20/2017 1:39:05 PMPPASS
All lots in EC#7 are complete/occupied except for two. These lots will be covered seperately when constructed.

No further grading, subdivision work, or stabilization remaining. ESC permit conditions satisfied. ESC permits for phase #8 & #9 are active.
ESC16-01006 General Inspection7/20/20177/20/20177/20/2017 1:33:51 PM PASS
WIP on SFHs. DI's have sediment protection. No trackout, spills or discharges observed. No fugitive dust from adjacent phase of Millwell park observed.
ESC16-01370 General Inspection7/20/20177/20/20177/20/2017 1:27:30 PMPPASS
Near completion. Some final landscaping and clean up is in progress. RP Jim on site, stated he will remove DI bag and call in Site Final within the next 2 weeks. No corrections requested.
ESC15-00853 General Inspection7/20/20177/20/20177/20/2017 11:30:03 AM PASS
WIP on townhomes at entrance. 4 units at east end are complete. BMPs installed (trash containment, inlet protection, perimeter wattles). No trackout or discharges to Hill road.
ESC16-01316 Site Final7/20/20177/20/20177/20/2017 11:26:37 AMPPASS
Home complete and landscaped. Active homes in North Hill covered seperately and on main site permit ESC15-00853.
ESC16-01314 Site Final7/20/20177/20/20177/20/2017 11:26:06 AMPPASS
HOme complete and landscaped. Active homes in North Hill covered seperately and on main site permit ESC15-00853.
ESC16-01338 Site Final7/20/20177/20/20177/20/2017 11:25:06 AMPPASS
HOme complete and landscaped. Active homes in North Hill covered seperately and on main site permit ESC15-00853.
ESC16-01337 Site Final7/20/20177/20/20177/20/2017 11:24:30 AMPPASS
HOme complete and landscaped. Active homes in North Hill covered seperately and on main site permit ESC15-00853.

ESC16-01333 General Inspection7/20/20177/20/20177/20/2017 11:21:29 AM PASS
WIP on interior at North Hill townhome. No trackout or discharges to Hill Road., Trash container onsite is maintained. Subdivision storm drains have sediment filter bags installed.

RP on duty. Need to continue weekly gutter sweep and trash pickup around active homes.
ESC16-01332 General Inspection7/20/20177/20/20177/20/2017 11:21:03 AM PASS
WIP on interior at North Hill townhome. No trackout or discharges to Hill Road., Trash container onsite is maintained. Subdivision storm drains have sediment filter bags installed.

RP on duty. Need to continue weekly gutter sweep and trash pickup around active homes.