Inspections for the day of: Friday, July 20, 2018.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01148 BLD-Final7/17/20187/20/20187/20/2018 4:51:58 PMPNR
Kevin Ezell--prefers mid morning Phone #: ###-####
BLD17-01088 BLD-Final7/20/20187/20/20187/20/2018 4:51:46 PMPPEND
Phase 3 will be ok as soon as fire/life/safety has signed off.
BLD18-01424 BLD-Energy code compliance7/20/20187/20/20187/20/2018 3:17:18 PMPPASS
Phone #: ###-#### Inspection requested via web by Kelly Stover
BLD18-01424 BLD-Framing/Rough-in7/20/20187/20/20187/20/2018 3:17:07 PMPPASS
Phone #: ###-#### Inspection requested via web by Kelly Stover
BLD18-01678 BLD-Framing/Rough-in7/20/20187/20/20187/20/2018 3:03:51 PMPPASS
Zack Phone #: ###-####. All framing issues have been resolved.
BLD18-01310 BLD-Final7/17/20187/20/20187/20/2018 2:49:56 PMPPASS
You can call Jim Carriview if you have any issues. Aloha Phone #: ###-#### Inspection requested via web by Colyn Levandoske
BLD18-01310 DOC - Permit Finaled7/20/20187/20/20187/20/2018 2:49:47 PMPPASS
BLD18-01450 BLD-Framing/Rough-in7/18/20187/20/20187/20/2018 2:15:25 PMPNR
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Mech rough in inspection has failed.
BLD18-01969 BLD-Final7/19/20187/20/20187/20/2018 2:14:56 PMPDONE
Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD18-01969 DOC - Permit Finaled7/20/20187/20/20187/20/2018 2:14:48 PMPPASS
BLD18-00799 BLD-Footing7/20/20187/20/20187/20/2018 2:12:25 PMPPASS
Concrete is scheduled to be poured at 3 pm. Phone #: ###-#### Inspection requested via web by KJ Savaria
BLD17-03581 BLD-Ceiling Grid Inspection7/19/20187/20/20187/20/2018 2:00:37 PMPNR
Adam Phone #: ###-####. Needs fire sprinkler rough in inspection.
BLD18-01499 BLD-Footing7/19/20187/20/20187/20/2018 1:54:33 PMPFAIL
spoke about possibly being there at 1// Doug Phone #: ###-####. Missing rebar in pit. Needs geotech report for pit footing and interior footing.
BLD16-04500 BLD-Framing/Rough-in7/20/20187/20/20187/20/2018 12:26:29 PMAFAIL
Please call Wes, framing foreman, when onsite to walk buildings. ###-#### Phone #: ###-#### Inspection requested via web by Sam Brown. Nail off C03 2ply truss upstairs. Windows at landing and next to shower stall upstairs required to be tempered.
BLD16-04511 BLD-Framing/Rough-in7/20/20187/20/20187/20/2018 12:05:42 PMAPASS
Please call Wes, framing foreman, when onsite to walk buildings. ###-#### Phone #: ###-#### Inspection requested via web by Sam Brown
BLD16-04502 BLD-Energy code compliance7/20/20187/20/20187/20/2018 12:05:07 PMAPASS
BLD16-04502 BLD-Framing/Rough-in7/20/20187/20/20187/20/2018 12:04:51 PMAPASS
BLD16-04501 BLD-Energy code compliance7/20/20187/20/20187/20/2018 12:04:33 PMAPASS
Please call Wes, framing foreman, when onsite to walk buildings. ###-#### Phone #: ###-#### Inspection requested via web by Sam Brown
BLD16-04501 BLD-Framing/Rough-in7/20/20187/20/20187/20/2018 12:04:16 PMAPASS
Please call Wes, framing foreman, when onsite to walk buildings. ###-#### Phone #: ###-#### Inspection requested via web by Sam Brown
BLD18-02148 BLD-Conference7/19/20187/20/20187/20/2018 10:10:13 AMADONE
Work almost completed. Will start install of sky lights next week. Last portion of new built up roof being placed over area of gymnastics tenant and work on cap on parapet.
BLD17-00944 BLD-Framing/Rough-in7/19/20187/20/20187/20/2018 9:56:13 AMAPASS
Bob Phone #: ###-####. Interior steel stud framed walls and hardlids ok at service lounge/service writers area.
BLD18-02294 BLD-Final7/19/20187/20/20187/20/2018 9:55:19 AMAPASS
call 15 mins ahead- Lisa Phone #: ###-####
BLD18-02458 BLD-Foundation7/19/20187/20/20187/20/2018 9:55:01 AMAPASS
Ryan Phone #: ###-####
BLD17-01088 BLD-Conference7/20/20187/20/20187/20/2018 12:00:00 AMPCANC
Barry Phone #: ###-####