ELE20-02348
| Final | 7/17/2020 | 7/20/2020 | 7/20/2020 2:48:03 PM | A | PASS |
|
|
There will be someone home. It is all exterior. If you have any questions please feel free to contact Andrew ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final.
|
ELE20-01865
| Electrical Rough-In | 7/20/2020 | 7/20/2020 | 7/20/2020 1:35:46 PM | P | PASS |
|
|
Underground. Phone #: ###-#### Inspection requested via web by Andy Chambers Ok cover conduit for front parking lot lights.
|
ELE20-02290
| Electrical Rough-In | 7/20/2020 | 7/20/2020 | 7/20/2020 12:30:13 PM | P | PASS |
|
|
Dave - */basement accessed from behind the house that is not occupied */Screened*/ Phone #: ###-#### Ok cover small basement area S side of house
|
ELE20-02293
| Final | 7/20/2020 | 7/20/2020 | 7/20/2020 11:56:44 AM | P | PASS |
|
|
Drew *screened (vitural if needed) Phone #: ###-#### Ok final downstairs den.
|
ELE20-02142
| Electrical Rough-In | 7/19/2020 | 7/20/2020 | 7/20/2020 11:30:00 AM | P | PASS |
|
|
Please call me a half hour before inspection so i can meet you and let you in. thanks Chris ###-#### Phone #: ###-#### Inspection requested via web by Chris Husted Ok cover 2 main level baths, brkroom and wall E of bathrooms
|
ELE20-02458
| Electrical Rough-In | 7/17/2020 | 7/20/2020 | 7/20/2020 9:49:33 AM | A | CANC |
|
|
Elana *occ home* call for access * screened* virtual Phone #: ###-#### Talked to homeowner, they decided to hire an electrical contractor
|
ELE20-00546
| Final | 7/20/2020 | 7/20/2020 | 7/20/2020 9:08:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jason Wicks Ok final. Corrections were- 1. Recepts not working on W wall. 2. Lockout for hood. 3. GFI protection for recepts within 6' of kitch sink. All corrections were made.
|
ELE17-03485
| ELE-Aging Inspection | 7/20/2020 | 7/20/2020 | 7/20/2020 5:50:23 AM | | DONE |
|
|
Review notes on 4/20
|
ELE18-00260
| ELE-Aging Inspection | 7/20/2020 | 7/20/2020 | 7/20/2020 5:49:45 AM | | DONE |
|
|
Review notes on 4/20
|
ELE20-02374
| Permanent Service | 7/17/2020 | 7/20/2020 | 7/20/2020 5:05:04 AM | A | CANC |
|
|
###-#### Inspection was done on 7/17 and passed. Talked to electrician on Fri, he wasnt sure if they were going to get service done or not. IDP had late disconnect, but service was completed.
|