ELE18-00153
| ELE-Aging Inspection | 7/20/2020 | 7/20/2020 | 7/21/2020 11:14:47 AM | | PEND |
|
|
This permit is still open with the City of Boise. Please call 208 ###-#### with progress report or any questions. If your job is complete, Please schedule an final inspection online, pdsonline.cityofboise.org Thank You!
|
ELE20-02487
| Electrical Rough-In | 7/20/2020 | 7/20/2020 | 7/20/2020 3:13:16 PM | P | PART |
|
|
Partial cover for kitchen, bedrooms, bathroom, ulitity room, familyroom except for; No cover for dinning room, front door outside entry light, needs a mounting box.
|
ELE20-02487
| Conference | 7/20/2020 | 7/20/2020 | 7/20/2020 3:06:51 PM | P | DONE |
|
|
Discussed electrical requirements for a single family dwelling, installation already in progress. Garage roughed-in and covered pryor ok to cover inspection. Three areas to be opened for access to verify wiring compliance.
|
ELE18-02365
| ELE-Aging Inspection | 7/20/2020 | 7/20/2020 | 7/20/2020 10:48:13 AM | | PASS |
|
|
See final
|
ELE18-02365
| Final | 7/20/2020 | 7/20/2020 | 7/20/2020 10:47:58 AM | P | PASS |
|
|
No solar panels installed at this site, job was awarded to contractor. Final permit ok
|
ELE18-01099
| ELE-Aging Inspection | 7/20/2020 | 7/20/2020 | 7/20/2020 10:43:34 AM | | DONE |
|
|
Spoke with homeowner, still under construction.
|