Inspections for the day of: Monday, July 20, 2020.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-00153 ELE-Aging Inspection7/20/20207/20/20207/21/2020 11:14:47 AM PEND
This permit is still open with the City of Boise. Please call 208 ###-#### with progress report or any questions. If your job is complete, Please schedule an final inspection online, pdsonline.cityofboise.org Thank You!
ELE20-02487 Electrical Rough-In7/20/20207/20/20207/20/2020 3:13:16 PMPPART
Partial cover for kitchen, bedrooms, bathroom, ulitity room, familyroom except for;
No cover for dinning room, front door outside entry light, needs a mounting box.
ELE20-02487 Conference7/20/20207/20/20207/20/2020 3:06:51 PMPDONE
Discussed electrical requirements for a single family dwelling, installation already in progress. Garage roughed-in and covered pryor ok to cover inspection. Three areas to be opened for access to verify wiring compliance.
ELE18-02365 ELE-Aging Inspection7/20/20207/20/20207/20/2020 10:48:13 AM PASS
See final
ELE18-02365 Final7/20/20207/20/20207/20/2020 10:47:58 AMPPASS
No solar panels installed at this site, job was awarded to contractor. Final permit ok
ELE18-01099 ELE-Aging Inspection7/20/20207/20/20207/20/2020 10:43:34 AM DONE
Spoke with homeowner, still under construction.