BLD19-04773
| BLD-Framing/Rough-in | 7/20/2020 | 7/20/2020 | 7/21/2020 7:07:46 AM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//ok to air seal 2 hr walls, insulate//ok to air seal and insulate front and rear walls that require OSB sheathing on inside//add anchor bolts and/or nuts//
|
BLD19-04772
| BLD-Framing/Rough-in | 7/20/2020 | 7/20/2020 | 7/21/2020 7:07:29 AM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//ok to air seal 2 hr walls, insulate//ok to air seal and insulate front and rear walls that require OSB sheathing on inside//add anchor bolts and/or nuts//
|
BLD19-04770
| BLD-Framing/Rough-in | 7/20/2020 | 7/20/2020 | 7/21/2020 7:07:10 AM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//ok to air seal 2 hr walls, insulate//ok to air seal and insulate front and rear walls that require OSB sheathing on inside//add anchor bolts and/or nuts//
|
BLD19-04767
| BLD-Framing/Rough-in | 7/20/2020 | 7/20/2020 | 7/21/2020 7:06:52 AM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//ok to air seal 2 hr walls, insulate//ok to air seal and insulate front and rear walls that require OSB sheathing on inside//add anchor bolts and/or nuts//
|
BLD20-02123
| BLD-Footing | 7/20/2020 | 7/20/2020 | 7/20/2020 3:45:15 PM | P | CANC |
|
|
screened // Kent Phone #: ###-####
|
BLD20-00875
| BLD-Final | 7/17/2020 | 7/20/2020 | 7/20/2020 3:22:53 PM | P | PASS |
|
|
Gary *screened* *other door enterance. Phone #: ###-####//two detectors were switched for smoke/co combos to meet code requirements, sent via photos for confirmation//
|
BLD20-00875
| DOC - Permit Finaled | 7/20/2020 | 7/20/2020 | 7/20/2020 3:22:09 PM | P | PASS |
|
|
|
BLD19-04013
| BLD-Energy code compliance | 7/20/2020 | 7/20/2020 | 7/20/2020 2:23:40 PM | P | PART |
|
|
Matt *screened* Phone #: ###-####//ok pending tenting approval for fire sprinklers prior to cover//
|
BLD20-02315
| BLD-Final | 7/20/2020 | 7/20/2020 | 7/20/2020 1:51:29 PM | P | DONE |
|
|
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-02315
| DOC - Permit Finaled | 7/20/2020 | 7/20/2020 | 7/20/2020 1:51:17 PM | P | PASS |
|
|
Roof appears to be installed within code requirements//new roof flashings, ridge vent installed//
|
BLD20-01563
| BLD-Wall Bracing | 7/20/2020 | 7/20/2020 | 7/20/2020 1:19:02 PM | P | PASS |
|
|
screened // Christina Phone #: ###-####//designer provided wallbracing minor change for discrepancy in plan pages//appears to meet changes by designer//braing ok//
|
BLD19-03051
| BLD-Framing/Rough-in | 7/17/2020 | 7/20/2020 | 7/20/2020 12:05:00 PM | A | NR |
|
|
Mark- */Screened*/ Phone #: ###-####//See Correction notice posted onsite for framing corrections//
|
BLD20-02123
| BLD-Footing | 7/17/2020 | 7/20/2020 | 7/20/2020 11:19:02 AM | A | CANC |
|
|
screened // Kent Phone #: ###-####
|
BLD19-03475
| BLD-Conference | 7/20/2020 | 7/20/2020 | 7/20/2020 11:18:42 AM | A | DONE |
|
|
neighbor texted about work on exterior of home, permit is for interior remodel//CN issued for addition to front of home and deck being constructed in back//permit is for interior remodel only//also Electrical permit is required//follow up in 5 days//
|
BLD20-02066
| BLD-Footing | 7/17/2020 | 7/20/2020 | 7/20/2020 9:25:40 AM | A | CANC |
|
|
Inspection requested AM if possible please. Needs sign off from Jason Taylor of sub-grade inspection report received prior to footing inspection, have spoken with both Jason Taylor and inspector Dave Hannah. Phone #: ###-#### Inspection requested via web by David Dexter
|