BLD00-01554
| BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 11:38:11. Contact: ###-####.rec'd archs letter, keep c/n for frame 7/21/2000 10:48:44 AM
|
BLD00-00601
| BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | A | PART |
|
|
welding insp-- jim-- ###-####; pending report from strata 7/21/2000 8:44:27 AM
|
BLD00-02048
| BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | A | PART |
|
|
chris-- ###-#### fr; misc int work ok. 7/21/2000 11:36:27 AM
|
BLD00-01253
| BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | A | PART |
|
|
Greg ###-####; ok to s 7/21/2000 11:51:54 AMok to start parapet/21/2000 11:52:09 AM 7/21/2000 11:56:12 AM
|
BLD99-01399
| BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | A | PART |
|
|
###-####; pend elec. 7/21/2000 2:51:13 PM
|
BLD00-01133
| BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | A | PART |
|
|
###-####; fitting rms ok pend elec; need archs ok to delete full ht 7/21/2000 11:25:06 AM walls 7/21/2000 11:25:14 AM
|
MEC00-02084
| Final | 7/21/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/21/2000 at 10:51:09. Contact: ###-####. no elec power to system. 7/21/2000 3:50:45 PM
|
BLD00-01932
| BLD-Footing | 7/21/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | P | PART |
|
|
after 2pm Lee ###-####; ok to place tick ftg, recall wall/mono pour for insul. 7/21/2000 3:37:05 PM
|
MEC00-02463
| Rough-in | 7/21/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | P | FAIL |
|
|
and p/t MArtha ###-####;need gas line calc's, access, condensate slope, etc. 7/21/2000 5:21:51 PM
|
MEC00-02454
| Pressure Test | 7/21/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/21/2000 at 11:18:01. Contact: ###-####. as late as possible pm
|
BLD00-01258
| BLD-Final | 7/20/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | P | FAIL |
|
|
Dave ###-####; c/n re occ separation, glazing spec'd, & hvac has c/n; ok for t/o.card left onsite 7/21/2000 10:51:56 AM
|
BLD00-01351
| BLD-Wall cover | 7/19/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/19/2000 at 08:32:30. Contact: ###-####. shear ok 7/21/2000 4:19:05 PM
|
BLD00-00312
| BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 12:00:00 AM | P | PART |
|
|
ceiling on 1st floor gary ###-####; chk gas pipe penetration at 1hr. lid; ok to tile7/21/2000 3:09:12 PM 7/21/2000 3:09:22 PM 7/21/2000 3:13:34 PM
|