BLD03-00613
| FIRE-Final Inspection | 7/18/2003 | 7/21/2003 | 7/21/2003 12:00:00 AM | A | PASS |
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore the GC was going to get the address corrected with Thorton Oliver and permit desk - 106 11th is on the permit card but that is the address of the current location of the tenant 7/21/2003 8:23:27 AM
|
BLD02-03091
| FIRE-Conference | 7/21/2003 | 7/21/2003 | 7/21/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 7/21/2003 at 7:29:51 AM. Contact: ###-####. met with John and Troy about final requirements; heads moved up to ceiling in main lobby; frozen head in freezer and obstructed; gaurds on heads; exit sign lowered and need additional one in kitchen; repair and relocate exit sign by bar; storage in mezzanine not allowed; occupant load sign; hanging decorations may not be in comliance with UFC for decorations 7/21/2003 4:41:16 PM
|
FIR03-00300
| INSP-Sprinkler Rough-in/Hydro | 7/21/2003 | 7/21/2003 | 7/21/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 7/21/2003 at 7:29:52 AM. Contact: ###-####. okay to cover domed lobby area only 7/21/2003 4:34:39 PM
|
BLD03-00415
| FIRE-Conference | 7/21/2003 | 7/21/2003 | 7/21/2003 12:00:00 AM | P | PART |
|
|
RON..HE WILL CALL YOU SET UP A TIME; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows met with GC about final requirements; will need to verify AHU shutdown for shutdown on return side as mechanical plans didn't show size of units; extinguisher needed; door hardware and exiting through door to south 7/21/2003 4:36:04 PM
|
FIR03-00072
| INSP-Final Inspection | 7/21/2003 | 7/21/2003 | 7/21/2003 12:00:00 AM | P | PASS |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|