ELE04-02120
| Permanent Service | 7/21/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | A | PASS |
|
|
p/s o/h - ok 7/21/2004 10:32:34 AM
|
ELE04-02025
| Final | 7/21/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | A | PASS |
|
|
final outlets in kitchen and other p/s o/h rec - ok 7/21/2004 12:38:52 PM
|
ELE04-02185
| Electrical Rough-In | 7/21/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | P | PASS |
|
|
trench ok, cover hot tub ok 7/21/2004 11:58:42 AM
|
ELE04-02025
| Rough-In Permanent Service | 7/20/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | P | PART |
|
|
1)Upgraded service to 200amps. 2)Converted stair landing fusebox into a junction box. 3)Replaced old basement subpanel with new one and re-fed it with 100 amps. 4)Converted 2nd old basement subpanel next to the furnace into a junction box. 5)Ran a new 4 wire range circuit with receptacle. 6)Ran a new 30 amp circuit to the water heater. 7)Ran 2 new 120 volt circuits to 2 new GFCI kitchen counter top receptacles. 8)Ran a new 4 wire dryer circuit with receptacle. 9)Re-vamped some of the other old wiring in the basement. Thanks!!! Dan. ; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell p/s o/h rec 7/21/2004 10:51:08 AM
|
ELE04-02184
| Electrical Rough-In | 7/21/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | P | PASS |
|
|
Trench inspection; Phone #: ###-#### Internet Inspection Request from: Dana Moyer
|
ELE04-02112
| Electrical Rough-In | 7/21/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/21/2004 at 8:20:09 AM. Contact: ###-####. ceiling bathrooms 7/21/2004 1:52:29 PM
|
ELE04-02202
| Electrical Rough-In | 7/21/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | P | PASS |
|
|
Inspection for underground pipe please///###-#### bob
|