ESC04-00474
| BMP Violation | 7/20/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | A | PART |
|
|
Follow up. Construction entrance installed but no waste container observed on site. 7/21/2004 2:30:22 PM
|
ESC04-00474
| BMP Violation | 7/20/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | A | PASS |
|
|
Follow up. Construction entrance in place and dumpster on site for solid waste debris. Sweep daily or as needed. 7/23/2004 10:39:33 AM
|
ESC03-00983
| Site Final | 7/20/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | A | PART |
|
|
Need to remove straw bales, reposition some of the straw wattles, and keep some wattles in place another season, then remove. Cindy Lou ###-####, ###-####. 7/21/2004 1:43:00 PM
|
ESC03-00609
| Conference | 7/21/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | A | PART |
|
|
Random inspection Rill/gully erosion observed on bare hillsides. RP had been warned of this earlier. Silt fence and straw wattles are now in place, should help minize further damage. Minor trackout observed. 7/21/2004 7:44:27 AM
|
ESC03-01233
| Site Final | 7/21/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | A | PASS |
|
|
|
ESC04-00011
| Tracking Control | 7/21/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | P | PART |
|
|
Informed rp that to achieve MEP on trackout onto Warm Springs that the existing construction entrances are not long enough. RP stated that he would look at them and increasing the size is possible. Also, informed me that soon a sweeper will be on site. 7/21/2004 3:02:32 PM
|
ESC04-00802
| Tracking Control | 7/21/2004 | 7/21/2004 | 7/21/2004 12:00:00 AM | P | PART |
|
|
Trackout on Federal Way, no construction entrance, no d.i protection. Follow approved plan. Sweep daily or as needed. Sign was posted; 7/21/2004 3:29:10 PM 7/21/2004 3:36:49 PM
|