Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-01186 FIRE-Final Inspection7/20/20047/21/20047/21/2004 12:00:00 AMAPASS
Fire life safety finaled. Per the mechanical contractor the hvac unit that servers both spaces 103 and 104 is under 2000cfm. 7/21/2004 9:42:19 AM
BLD04-01342 FIRE-Final Inspection7/20/20047/21/20047/21/2004 12:00:00 AMAPASS
Fire life safety finaled. Per the mechanical contractor the hvac unit that servers both spaces 103 and 104 is under 2000cfm. 7/21/2004 9:42:27 AM
FIR03-00779 INSP-Sprinkler Rough-in/Hydro7/20/20047/21/20047/21/2004 12:00:00 AMAPASS
Hydro test for the wet system passed. Provide forward flush of the backflow preventor per review note #9. Provide signage. Provide alarm interconnections between FACP and new dry pipe riser. Provide head in closet and provide hanger per previous correction notice. 7/21/2004 2:25:31 PM
BLD03-02718 FIRE-Final Inspection7/20/20047/21/20047/21/2004 12:00:00 AMAPASS
Life safety finaled 7/21/2004 8:21:08 AM
FIR04-00268 INSP-Final Inspection7/20/20047/21/20047/21/2004 12:00:00 AMPFAIL
Upright sprinkler heads are overspaced in atleast three locations. See plans. Two pendant sprinkler heads are less than 6' apart. See plans. Atleast one armover exceeds 2'. See plans. Inspection was stopped and no other items looked at. These items appear to be existing conditions. Scope of work for the building permit encompasses the entire building therefore the entire sprinkler system shall meet code. Resubmitt plans showing all sprinkler piping, sizing and sprinkler head locations. Show modifications required to meet code. Do not install any more ceiling tile. 7/21/2004 3:35:13 PM
BLD04-00046 FIRE-Final Inspection7/21/20047/21/20047/21/2004 12:00:00 AMPFAIL
Project is actually called Wynn's Mill End Fabric. Provide verification to Bill Alexander that the sprinkler system can meet the requirements for the commodities stored. Resubmittals shall meet the requirements of IFC chapter 23. Provide approved door hardware on the second front entry/exit door. Provide sticker as discussed on the main entry/exit with keyed hardware. 7/21/2004 2:03:17 PM