Inspections for the day of: Thursday, July 21, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00043 INSP-Sprinkler Rough-in/Hydro7/21/20057/21/20057/21/2005 4:09:59 PMPFAIL
Hanger at last head on SE side is too close to sprinkler upright, missing coverage at front of stair entrance where head is overspaced.
FIR05-00308 INSP-Final Inspection7/21/20057/21/20057/21/2005 2:43:58 PMPFAIL
Strobe lens on fire alarm notification devices are below code acceptable height for wall mounted applications.
BLD05-00463 FIRE-Final Inspection7/19/20057/21/20057/21/2005 1:31:29 PMAFAIL
Emergency lighting and exit signs failed to operate under backup power, no other life safety issues inspected at this time. Contractor to re-schedule when ready.
BLD04-02153 FIRE-Final Inspection7/19/20057/21/20057/21/2005 1:27:31 PMAFAIL
Provide curb painting at FD access as highlighted on plans and per discussion, verify functionality of main entry/exit mag locks, provide sinage at elevators.
FIR05-00262 INSP-Final Inspection7/21/20057/21/20057/21/2005 12:33:07 PMAFAIL
The entire lens of wall mounted strobe devices must be installed between 80" and 96" AFF to meet code requirements, see fire alarm plan review notes.
FIR05-00306 INSP-Final Inspection7/19/20057/21/20057/21/2005 12:28:28 PMAPART
Work is satisfactory, final pending sign-off on shell permit FIR05-00111.
FIR05-00111 INSP-Final Inspection7/19/20057/21/20057/21/2005 12:25:08 PMAFAIL
Provide foreward flow test of backflow preventer, provide NFPA25, attatch calc. sticker, install missing escutcheon at riser room, sinage to indicate areas controled by system control valves.
FIR04-00749 INSP-Final Inspection7/19/20057/21/20057/21/2005 12:19:21 PMAPASS
Underground fire supply permit finaled.
FIR05-00408 INSP-Sprinkler Rough-in/Hydro7/20/20057/21/20057/21/2005 12:17:17 PMAPART
Overhead rough-in is satisfactory. Will final permit when ceiling tile and escutcheons are installed.