Inspections for the day of: Tuesday, July 21, 2009.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-02685 BLD-Framing/Rough-in7/21/20097/21/20097/21/2009 4:53:30 PMPPART
wip ok
BLD08-02247 BLD-Framing/Rough-in7/21/20097/21/20097/21/2009 4:30:40 PMPNR
michael Phone #: ###-####
BLD09-00323 BLD-Conference7/21/20097/21/20097/21/2009 4:25:31 PMPPASS
Travis--change of GC''s need to document stage of permit @time time of change of GC Phone #: ###-#### buildib is rough frme with no rough ins done
BLD09-00955 BLD-Conference7/21/20097/21/20097/21/2009 2:58:41 PMPPASS
ok for cover
BLD09-00955 BLD-Framing/Rough-in7/21/20097/21/20097/21/2009 2:58:19 PMPPASS
BLD09-00899 BLD-Final7/20/20097/21/20097/21/2009 2:28:43 PMPPASS
James Phone #: ###-####
ESC09-00328 Site Final7/21/20097/21/20097/21/2009 2:28:33 PMPPASS
BLD09-00991 BLD-Foundation7/21/20097/21/20097/21/2009 2:23:42 PMPPASS
Scheduled by a contractor via Hello! on 7/21/2009 at 9:42:17 AM. Contact: ###-####.
ESC09-00371 Random Inspection7/21/20097/21/20097/21/2009 2:22:45 PMPCANC
ESC07-01433 Random Inspection7/21/20097/21/20097/21/2009 12:06:39 PMAPASS
BLD06-02324 BLD-Aging Inspection7/21/20097/21/20097/21/2009 12:06:17 PM PASS
BLD09-01142 BLD-Final7/20/20097/21/20097/21/2009 12:06:02 PMANR
dan - please call 1/2 prior Phone #: ###-####
BLD02-00040 BLD-Aging Inspection7/21/20097/21/20097/21/2009 10:33:53 AM FAIL
still needs other finals
ESC07-01431 Random Inspection7/21/20097/21/20097/21/2009 10:28:23 AMAPASS
BLD06-02322 BLD-Aging Inspection7/21/20097/21/20097/21/2009 10:27:57 AM PASS
BLD09-00991 BLD-Foundation7/20/20097/21/20097/21/2009 10:00:12 AMAPART
Scheduled by a contractor via Hello! on 7/20/2009 at 6:34:43 AM. Contact: ###-####.
ESC09-00371 Random Inspection7/21/20097/21/20097/21/2009 9:59:56 AMPFAIL
correction notice incomplete at this time
ESC07-01450 Random Inspection7/21/20097/21/20097/21/2009 9:57:35 AMAPASS
BLD07-03014 BLD-Aging Inspection7/21/20097/21/20097/21/2009 9:57:04 AM PASS
MIS09-00092 MIS-Aging Inspection7/21/20097/21/20097/21/2009 9:56:38 AM PASS
MIS09-00092 DOC - Permit Finaled7/21/20097/21/20097/21/2009 9:56:31 AMPPASS
BLD09-00323 BLD-Conference7/20/20097/21/20097/21/2009 9:52:29 AMAPASS
Michael from Capital City called and said that him and the owner had a falling out and they are no longer doing the job but the owner has already hired someone else and they have begun work under Capital City''s permit. Michael wants the job tagged until the GC is changed on the permit. We need letter stating Capital City is not doing the job and the new GCs info. Phone #: ###-#### informed owner to change gen contractor at city,told old general that owner was going to do so, there is no work going on at this time
BLD09-00267 BLD-Concrete7/20/20097/21/20097/21/2009 9:04:38 AMAPASS
Pouring Produce deparment sales slab at 4:00 am. MTI scheduled to perform special inspections. Phone #: ###-#### Internet Inspection Request from: Mike Tsu