Inspections for the day of: Tuesday, July 21, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00987 General Inspection7/21/20097/21/20097/21/2009 4:18:26 PMPFAIL
Verbal to RP:
Protect all new storm drain inlets within project area. Will permit just filter fabric due to the phase of work and time of year.
Clean up all trash debris surrounding the project area.
Clean up all hard surfaces of all sediment and debris off of all hard surfaces. Will re-inspect on 7/24/09PM.
ESC09-00308 Site Preparation7/21/20097/21/20097/21/2009 3:52:55 PM CANC
Moved to 7/22/09 at 2PM.
ESC09-00441 Site Preparation7/21/20097/21/20097/21/2009 12:46:26 PM PASS
ESC09-00160 BMP Violation7/16/20097/21/20097/21/2009 12:40:59 PMAFAIL
Issued on the canal have been taken care of.
Verbal to RP:
Clean up all sediment and debris off of all hard surfaces with the drive way and Five Mile Rd.
Extend the construction exit to a 50ft min on the exit to the west.
ESC09-00298 Tracking Control7/20/20097/21/20097/21/2009 12:38:53 PMAPART
Still need to put up the ESC sign.
ESC09-00439 Site Preparation7/21/20097/21/20097/21/2009 11:22:21 AM PASS
ESC09-00344 Site Preparation7/21/20097/21/20097/21/2009 10:43:14 AM NR
Will re-inspect on 7/27/09PM.
ESC09-00403 Site Preparation7/21/20097/21/20097/21/2009 10:37:56 AM FAIL
Message to RP:
Relocate washout pit where it will be accesible to the concrete trucks. Will re-inspect on 7/23/09AM.
ESC09-00438 Site Preparation7/21/20097/21/20097/21/2009 10:14:29 AM PASS
ESC09-00392 Site Preparation7/21/20097/21/20097/21/2009 10:01:42 AM PASS
ESC09-00352 Conference7/20/20097/21/20097/21/2009 9:44:20 AMADONE
Discussed over the dewatering process and will be monitoring while in the process.
ESC09-00352 General Inspection7/20/20097/21/20097/21/2009 9:43:25 AMAPART
Have ran into pocket of water where they have been excavating out unsuitibles soils. Will check with the GC and RP to see how the dewatering method will occur.
ESC09-00371 Site Preparation7/16/20097/21/20097/20/2009 3:33:37 PMACANC