Inspections for the day of: Wednesday, July 21, 2010.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS10-00099 MIS-Aging Inspection7/21/20107/21/20107/22/2010 9:38:42 AM DONE
ESC05-01016 Aging Inspection7/21/20107/21/20107/21/2010 3:48:12 PM DONE
ESC05-01016 DOC - Permit Finaled7/21/20107/21/20107/21/2010 3:48:05 PMPPASS
ESC10-00382 Site Preparation7/21/20107/21/20107/21/2010 3:44:39 PM PART
Providing a washout for the footing pours.
ESC10-00506 Site Preparation7/21/20107/21/20107/21/2010 2:09:15 PM FAIL
Verbal to RP:
Correction Notice:
1. Clean all residual leaching from the debris container.
2. Protect the storm drain inlet.
3. Post ESC where it is visable from the street.
Failure to comply within the given time frame will result in a stop work order. Will re-inspect for compliance on 7/22/2010AM.
ESC10-00539 Site Preparation7/21/20107/21/20107/21/2010 1:37:25 PM PASS
ESC10-00534 Site Preparation7/20/20107/21/20107/21/2010 10:16:00 AMACANC
Completed by 450
ESC10-00495 Site Preparation7/16/20107/21/20107/21/2010 10:13:59 AMANR
ESC10-00431 Site Preparation7/21/20107/21/20107/21/2010 10:02:05 AMPPASS
ESC10-00496 Site Preparation7/14/20107/21/20107/21/2010 9:54:04 AMACANC
No excavating has occured
ESC08-00706 General Inspection ESC7/21/20107/21/20107/21/2010 9:53:23 AM DONE
All project area is stbilized
ESC08-00706 DOC - Permit Finaled7/21/20107/21/20107/21/2010 9:53:02 AMPPASS