FIR10-00137
| INSP-Final Inspection | 7/20/2011 | 7/21/2011 | 7/22/2011 6:47:34 PM | A | FAIL |
|
|
Items noted during notification circut testing include sync issues at the basement level, various non-functional devices on the 1st floor, insufficient EOL voltage as measured, missing tone cycle preceeding and following the voice message, audibility at some areas such as the gym, spin, fitness, cardio and weight rooms do not appear sufficient.
|
FIR10-00213
| FIR-Aging Inspection | 7/21/2011 | 7/21/2011 | 7/21/2011 3:57:44 PM | | PEND |
|
|
Ref. activity note 7/8
|
FIR08-00239
| INSP-Sprinkler Rough-in | 7/20/2011 | 7/21/2011 | 7/21/2011 3:54:53 PM | P | PART |
|
|
Third floor building #2 sheetrock lids and soffits okay for cover. Minor adjustments made while on site.
|
BLD11-00718
| FIRE-Conference | 7/21/2011 | 7/21/2011 | 7/21/2011 3:52:50 PM | P | DONE |
|
|
Regarding project schedule and related fire alarm permit work.
|
FIR11-00266
| INSP-Final Inspection | 7/20/2011 | 7/21/2011 | 7/21/2011 3:51:37 PM | A | PART |
|
|
Final pending four missing escutcheons at the west lobby, mens restroom and RR vestibule.
|
BLD11-01511
| FIRE-Final Inspection | 7/20/2011 | 7/21/2011 | 7/21/2011 3:49:46 PM | A | FAIL |
|
|
Correction items include; repair four emergency lights, remove second keyed lock at the main entry/exit door, provide panic hardware at the middle exit or delete as discussed.
|