Inspections for the day of: Thursday, July 21, 2011.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00418 Site Preparation7/21/20117/21/20117/21/2011 3:35:08 PM NR
Work will begin on 7/25/2011
ESC10-00922 General Inspection7/21/20117/21/20117/21/2011 3:00:48 PM PASS
ESC11-00081 Aging Inspection7/21/20117/21/20117/21/2011 3:00:07 PM DONE
permit finaled.
ESC11-00081 DOC - Permit Finaled7/21/20117/21/20117/21/2011 2:59:46 PMPPASS
ESC11-00491 Site Preparation7/21/20117/21/20117/21/2011 2:59:13 PM NR
3 weeks out from start
ESC11-00427 General Inspection7/21/20117/21/20117/21/2011 2:04:02 PMPCANC
Wrong date
ESC11-00054 Site Preparation7/7/20117/21/20117/21/2011 2:02:44 PMAFAIL
Verbal to RP:
Clean up all tracking by the end ofthe day. Will follow up on 7/22/2011
ESC11-00462 Site Final7/20/20117/21/20117/21/2011 1:25:41 PMAPASS
ESC11-00427 Site Preparation7/21/20117/21/20117/21/2011 1:23:25 PM PART
Verbal to RP:
Post the ESC sign at the front of the project lot where it is visable from the street. Will follow up on 7/22/2011pm.
ESC09-00352 General Inspection7/21/20117/21/20117/21/2011 1:20:16 PM PART
MIS11-00175 ESC-Conference7/21/20117/21/20117/21/2011 1:19:47 PMAFAIL
STOP WORK ORDER:

Informed the contractor that an ESC plan is required due to utilily work/ repair on commercial property. They must also check with public works and the plumbung department if any permit or conditions are required. All permits must be issued or an approval from the other departments that a permit is not required prior to the stop work order to be released. A special investigation fee will be added to permit fees.