ELE13-00542
| ELE-Aging Inspection | 7/21/2015 | 7/21/2015 | 7/21/2015 2:57:18 PM | | CANC |
|
|
too busy
|
ELE13-00835
| ELE-Aging Inspection | 7/21/2015 | 7/21/2015 | 7/21/2015 2:56:38 PM | | CANC |
|
|
too busy
|
ELE13-01374
| ELE-Aging Inspection | 7/21/2015 | 7/21/2015 | 7/21/2015 2:55:27 PM | | CANC |
|
|
Too busy
|
ELE15-02240
| Rough-In Permanent Service | 7/20/2015 | 7/21/2015 | 7/21/2015 2:37:51 PM | P | PASS |
|
|
Need ok for Idaho Power to turn service back on Phone #: ###-#### Inspection requested via web by Randy Fletcher Service change only rough in ok. p/s u/g rec ok
|
ELE15-01776
| Electrical Rough-In | 7/21/2015 | 7/21/2015 | 7/21/2015 2:16:41 PM | P | PASS |
|
|
Thank you Phone #: ###-#### Inspection requested via web by Eric Brown Patio cover rough in ok cover.
|
ELE15-01824
| Electrical Rough-In | 7/20/2015 | 7/21/2015 | 7/21/2015 1:37:07 PM | P | PASS |
|
|
We are requesting a ceiling rough-in inspection for tomorrow 7/21/15 in the afternoon. Our onsite contact is Rich @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Check disconnecting means located in ceiing of focus room for a transfomer located on other side of new wall is with in sight of transformer it serves. Grid in focus, security, and IT rooms rough in ok cover
|
ELE15-02247
| Final | 7/21/2015 | 7/21/2015 | 7/21/2015 1:03:33 PM | P | FAIL |
|
|
Contact is Jon Fivecoat at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce See permenant service.
|
ELE15-02247
| Permanent Service | 7/21/2015 | 7/21/2015 | 7/21/2015 12:59:52 PM | P | FAIL |
|
|
Contact is Jon Fivecoat at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce BCC 4-05-32- Code violations not to be retained. 200.6- Grounded conductor shall be identified with white. 250.50- All available grounding electode systems shall be used. Metal water pipe. 250.134-Concentic broken out in bot of panel. Shall be repaired. 230.24-Overhead service mast shall be secured in place.
|
ELE15-02225
| Final | 7/21/2015 | 7/21/2015 | 7/21/2015 12:56:00 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Needed rough in inspection
|
ELE15-02225
| Electrical Rough-In | 7/21/2015 | 7/21/2015 | 7/21/2015 12:13:46 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Rough in ok cover
|
GCE15-00108
| GCE-Final | 7/20/2015 | 7/21/2015 | 7/21/2015 11:39:37 AM | A | PASS |
|
|
Mike ###-#### Added new transfer switch to service and established new service and transfer switch. Bonding done at transfer switch, original mains have separation of neutral and grounds. Final ok
|
GCE15-00108
| GCE-Permanent Service | 7/21/2015 | 7/21/2015 | 7/21/2015 11:37:39 AM | P | PASS |
|
|
Mike ###-#### p/s u/g rec ok
|
GCE15-00086
| GCE-Final | 7/20/2015 | 7/21/2015 | 7/21/2015 10:59:18 AM | A | PASS |
|
|
Jason ###-#### - requested 1hr. call ahead 3 cooling units installed. Final ok
|
GCE15-00096
| GCE-Final | 7/20/2015 | 7/21/2015 | 7/21/2015 10:58:18 AM | A | PASS |
|
|
Jason ###-#### - requested 1hr. call ahead Equipment not listed for US, CE listing is now acceptable as per new state law. Final ok
|
ELE15-02243
| Electrical Rough-In | 7/20/2015 | 7/21/2015 | 7/21/2015 9:53:12 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by Celinda Winters No answer at door. Contractor said he would reschedule
|
ELE15-02223
| Electrical Rough-In | 7/20/2015 | 7/21/2015 | 7/21/2015 9:08:25 AM | A | PASS |
|
|
Inspection requested via web by Rowdy Monroe Rough in ok cover
|
ELE15-02223
| Permanent Service | 7/21/2015 | 7/21/2015 | 7/21/2015 9:07:05 AM | P | PASS |
|
|
Inspection requested via web by Rowdy Monroe p/s u/g n ok
|
ELE15-01413
| Electrical Rough-In | 7/20/2015 | 7/21/2015 | 7/20/2015 3:14:48 PM | A | PASS |
|
|
We are requesting a ceiling rough-in for this project. Our contact is Bud ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate Grid rough in ok cover
|