PLM15-02367
| Final | 7/21/2015 | 7/21/2015 | 7/21/2015 2:45:32 PM | P | PASS |
|
|
|
MEC15-00707
| Final | 7/20/2015 | 7/21/2015 | 7/21/2015 12:38:58 PM | A | FAIL |
|
|
lock box code if needed is 2500 Phone #: ###-#### Inspection requested via web by Ray Bolinger 1) reilif valve required on water heaters piped to an approved location. 2) provide access to roof to verify terminations. 3) complete gas connections. 4) 4" clearance required infront of center unit. 5) provide installation instructions for the direct vent conversion kit to verify approved material. 6) insulate plenum in crawl.
|
PLM15-02410
| Water and/or Sewer | 7/20/2015 | 7/21/2015 | 7/21/2015 8:42:53 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Kirk Johns shower valve and drain ok no toilet or lav yet
|
MEC15-03139
| Pressure Test | 7/20/2015 | 7/21/2015 | 7/21/2015 8:14:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart 20# test ok
|
MEC15-03139
| Rough-in | 7/20/2015 | 7/21/2015 | 7/21/2015 8:13:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart ri 20# test ok
|