FIR16-00451
| INSP-Final Inspection | 7/21/2016 | 7/21/2016 | 7/21/2016 3:31:43 PM | P | CANC |
|
|
Rescheduled for tomorrow at 7:00
|
BLD16-01252
| FIRE-Final Inspection | 7/21/2016 | 7/21/2016 | 7/21/2016 3:31:03 PM | P | FAIL |
|
|
Provide exit discharge light at the main exit, repair rear exit sign and provide emergency lighting per the plans in the corridor.
|
BLD16-02454
| FIRE-Final Inspection | 7/21/2016 | 7/21/2016 | 7/21/2016 3:30:05 PM | P | FAIL |
|
|
Repair emergency light upstairs and provide single action hardware at the riser room
|
BLD16-01182
| FIRE-Conference | 7/20/2016 | 7/21/2016 | 7/21/2016 3:28:10 PM | P | DONE |
|
|
went over life safety requirements
|
FIR16-00467
| INSP-Final Inspection | 7/20/2016 | 7/21/2016 | 7/21/2016 3:26:20 PM | P | CANC |
|
|
Overbooked. Reschedule for tomorrow morning
|
FIR16-00427
| INSP-Sprinkler Rough-in/Hydro | 7/21/2016 | 7/21/2016 | 7/21/2016 3:22:24 PM | P | CANC |
|
|
Overbooked. Reschedule for tomorrow morning at 7:30
|
BLD16-02446
| FIRE-Conference | 7/21/2016 | 7/21/2016 | 7/21/2016 1:38:08 PM | P | DONE |
|
|
Gary, Carl and I went over life safety requirements. Most specifically the need for fire alarm modifications for the new tenant
|
FIR16-00463
| INSP-Final Inspection | 7/20/2016 | 7/21/2016 | 7/21/2016 1:36:53 PM | P | CANC |
|
|
Moved 1 Head. Rough to cover and Final inspection. Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
FIR16-00463
| INSP-Sprinkler Rough-in | 7/20/2016 | 7/21/2016 | 7/21/2016 1:36:22 PM | P | PASS |
|
|
Rough to cover passed on the one head in the scope of work but I found another overspaced head outside of the scope of work and per Rick and my conversation I will leave this permit open and let him finish this work prior to a final.
|
FIR16-00052
| INSP-Supply line flush | 7/20/2016 | 7/21/2016 | 7/21/2016 10:41:31 AM | P | FAIL |
|
|
Arrived on site and found both the underground and overhead pressure guages way under 200psi. I spoke to Gordon and he is going to reschedule. No plans are on site for a rough-in for the draft stops.
|
FIR16-00052
| INSP-Sprinkler Rough-in/Hydro | 7/20/2016 | 7/21/2016 | 7/21/2016 10:41:02 AM | P | FAIL |
|
|
Arrived on site and found both the underground and overhead pressure guages way under 200psi. I spoke to Gordon and he is going to reschedule. No plans are on site for a rough-in for the draft stops.
|
BLD16-02663
| FIRE-Final Inspection | 7/20/2016 | 7/21/2016 | 7/21/2016 10:38:17 AM | A | PASS |
|
|
life safety passed
|
FIR16-00427
| INSP-Sprinkler Rough-in | 7/20/2016 | 7/21/2016 | 7/21/2016 9:29:50 AM | A | FAIL |
|
|
Provide the small documents, heads are located too close to one another, riser is too far from wall, tenting not complete, underground supply is too shallow..ect.
|
FIR16-00080
| INSP-Final Inspection | 7/14/2016 | 7/21/2016 | 7/21/2016 9:28:07 AM | A | PASS |
|
|
Permit finled. No electrical is functional under the hoods this includes outlets and lighting. If, in the future, these are made functional an electrical shunt may be required.
|
FIR16-00427
| INSP-Sprinkler Rough-in/Hydro | 7/20/2016 | 7/21/2016 | 7/21/2016 8:52:39 AM | A | FAIL |
|
|
This inspection was for an underground cover. Piping is installed at the other end of the house and is not at the required 4'-6" minimum bury depth. Piping can not be covererd.
|
FIR16-00455
| INSP-Sprinkler Rough-in | 7/20/2016 | 7/21/2016 | 7/21/2016 8:46:03 AM | A | PASS |
|
|
Todays inspection was just for the underground stub-out to 5'-0". It is ok for cover. We spoke about the CPVC requirment to be with-in 1 1/2" of the wall when exposed.
|
FIR16-00361
| INSP-Final Inspection | 7/20/2016 | 7/21/2016 | 7/21/2016 8:25:34 AM | A | PASS |
|
|
Permit finaled
|