PLM17-02694
| Final | 7/21/2017 | 7/21/2017 | 7/21/2017 4:52:36 PM | P | PART |
|
|
well disconnect ok, ok to cover waterline
|
PLM17-02478
| Plumbing Rough-in | 7/21/2017 | 7/21/2017 | 7/21/2017 2:50:46 PM | P | PART |
|
|
Final out this work requested 10 shower valves complete per permit requested. Phone #: ###-#### Inspection requested via web by Joseph Corcoran this inspection was for the tub valves in 6 buildings, they are ok to cover, when contractor provides spreadsheet with building addresses and fixtures this inspection can be transfered to those permits and this permit can be finaled because there is no work being done in this building. the units are... unit 185 in building 12 units 264 and 360 in building 9 unit 345 in building 7 unit 235 in building 6 unit 313 in building 3 units 201 and 203 in building 2
|
PLM17-02724
| Water and/or Sewer | 7/20/2017 | 7/21/2017 | 7/21/2017 1:22:25 PM | P | PASS |
|
|
Inspection requested via web by Craig Allumbaugh
|
PLM17-02724
| Sprinkler (Final) | 7/21/2017 | 7/21/2017 | 7/21/2017 1:22:14 PM | P | PASS |
|
|
Inspection requested via web by Craig Allumbaugh covered dcva tested
|
PLM17-02729
| Plumbing Rough-in | 7/21/2017 | 7/21/2017 | 7/21/2017 1:11:38 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Bennett ri ok
|