PLM02-01744
| Plumbing Rough-in | 7/16/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | A | PASS |
|
|
just the t&p and pan drains
|
PLM02-02033
| Water and/or Sewer | 7/19/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | A | PART |
|
|
###-#### water 129 and 231 7/22/2002 9:30:45 AM
|
PLM02-00340
| Final | 7/19/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | A | NR |
|
|
###-#### went out on this one friday, no temp on the rest of the building untill they an handle the waste from the chemical storage area. 7/22/2002 9:32:48 AM
|
PLM02-00935
| Plumbing Rough-in | 7/20/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 07/20/2002 at 12:40:00. Contact: ###-####. drainage fittings abs, pipe pcv, one or the other. 7/22/2002 2:07:59 PM
|
PLM02-02049
| Sprinkler (Final) | 7/22/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | P | PASS |
|
|
BRIAN ###-####
|
PLM02-02210
| Water and/or Sewer | 7/22/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | P | PASS |
|
|
STEVE ###-####
|
PLM02-00340
| Final | 7/22/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | P | NR |
|
|
same old thing 7/22/2002 4:59:01 PM
|
PLM02-02123
| Sprinkler (Final) | 7/16/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | P | PASS |
|
|
backflow- lou- ###-####
|