FIR02-00209
| INSP-Sprinkler Rough-in/Hydro | 7/19/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | A | PASS |
|
|
rick ###-#### overhead and UG hydro okay 7/22/2002 2:55:54 PM
|
BLD02-00292
| FIRE-Final Inspection | 7/22/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/22/2002 at 07:29:53. Contact: ###-####. rated door for corridor not tagged; needs smoke seal and closure; temp door installed until rated door arrives in two weeks 7/22/2002 10:05:05 AM
|
FIR02-00269
| INSP-Final Inspection | 7/22/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 409 On 7/22/2002 8:07:28 AM
|
FIR02-00167
| INSP-Sprinkler Rough-in/Hydro | 7/22/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 7/22/2002 10:20:31 AM hydro okay
|
BLD02-00505
| FIRE-Conference | 7/22/2002 | 7/22/2002 | 7/22/2002 12:00:00 AM | P | PART |
|
|
met with Mike (GC) and reviewed project and told him they need to get a letter ready for Dave Miller for them get approval to occupy the retrofit area of the old portion of the school. Alarms will have to work and exiting 7/22/2002 3:51:25 PM
|