Inspections for the day of: Monday, July 22, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01126 BLD-Framing/Rough-in7/19/20027/22/20027/22/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/19/2002 at 16:27:38. Contact: ###-####.c/n on site ok to insulate 7/22/2002 12:00:35 PM
MEC02-01901 Rough-in7/19/20027/22/20027/22/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/19/2002 at 16:58:08. Contact: ###-####.
BLD02-01755 BLD-Footing7/19/20027/22/20027/22/2002 12:00:00 AMAPASS
FT INSP -###-####- JONES
BLD02-01375 BLD-Foundation7/19/20027/22/20027/22/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 07/19/2002 at 13:22:48. Contact: ###-####.w.i.p about 80% 7/22/2002 4:20:50 PM
BLD02-01094 BLD-Energy code compliance7/19/20027/22/20027/22/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/19/2002 at 15:40:17. Contact: ###-####. still needs to seal chase on second floor ok to start sheet rocking all but this area 7/22/2002 4:20:22 PM
BLD02-01650 BLD-Conference7/19/20027/22/20027/22/2002 12:00:00 AMPDONE
brad ###-#### needs sheet rock on garage wall floor to under side of roof 7/22/2002 1:16:39 PM
BLD01-00086 BLD-Framing/Rough-in7/22/20027/22/20027/22/2002 12:00:00 AMPFAIL
###-#### c/n on site do not insulate 7/22/2002 3:52:18 PM
BLD02-01652 BLD-Conference7/22/20027/22/20027/22/2002 12:00:00 AMPDONE
header; Phone #: ###-####
BLD02-01291 BLD-Framing/Rough-in7/22/20027/22/20027/22/2002 12:00:00 AMPFAIL
ceiling grid; Phone #: ###-####