PLM04-01685
| Plumbing Rough-in | 7/21/2004 | 7/22/2004 | 7/22/2004 12:00:00 AM | A | PART |
|
|
had conf. with gary on approved set of plan,s will recall when ready for rough-in 7/22/2004 10:21:30 AM
|
PLM04-00244
| Plumbing Rough-in | 7/21/2004 | 7/22/2004 | 7/22/2004 12:00:00 AM | A | PASS |
|
|
plumbing rough-in and roof drains roof drains still need to be tested 7/22/2004 2:34:47 PM
|
PLM04-02029
| Sprinkler (Final) | 7/21/2004 | 7/22/2004 | 7/22/2004 12:00:00 AM | A | FAIL |
|
|
mustafa; Phone #: ###-#### Internet Inspection Request from: Annette Moore 7/22/2004 9:46:38 AM need to expose both shut-off and drain valve and piping up to backflow reduced pressure need,s to be installed 12 inch above finish grade to bottom of r.p. and have r.p. tested and certified left correction notice 7/22/2004 10:19:54 AM
|
PLM04-02028
| Plumbing Rough-in | 7/21/2004 | 7/22/2004 | 7/22/2004 12:00:00 AM | A | PASS |
|
|
roger; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles rough-in ok for new restroom and break room sink only 7/22/2004 10:23:08 AM
|
PLM04-02039
| Plumbing Rough-in | 7/22/2004 | 7/22/2004 | 7/22/2004 12:00:00 AM | P | PASS |
|
|
###-#### Frank
|
PLM04-02041
| Water and/or Sewer | 7/22/2004 | 7/22/2004 | 7/22/2004 12:00:00 AM | P | FAIL |
|
|
###-#### - ken test sewer line need additional cleanout for horizontal change of direction exceeding 135 degrees will also need a copy of recorded easement called Ken will recall when ready 7/22/2004 4:30:30 PM
|
PLM04-01685
| Plumbing Rough-in | 7/21/2004 | 7/22/2004 | 7/21/2004 12:00:00 AM | A | CANC |
|
|
need to meet with gary at 9:00 am
|