Inspections for the day of: Tuesday, July 22, 2008.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-02689 FIRE-Final Inspection7/21/20087/22/20087/23/2008 5:49:39 PMAPART
Pending approved hardware at the office slider doors.
BLD08-00197 FIRE-Final Inspection7/21/20087/22/20087/23/2008 5:48:15 PMAPASS
Noted corrections are complete, fire life safety passed.
FIR08-00485 INSP-Final Inspection7/21/20087/22/20087/23/2008 5:47:37 PMAPASS
Fire sprinkler modifications are acceptable, permit finaled.
FIR07-00606 INSP-Sprinkler Rough-in7/21/20087/22/20087/22/2008 4:15:06 PMPFAIL
Reinspection completed for Areas E,F,I and J failed due to several deficient items including 3 missing hangers, 4 missing upright heads at two mechanical rooms, overspaced pendent heads at two locations in the common corridor, overspaced heads at one classroom, missing all seismic bracing at the upper mechanical room, overspaced classroom vestibule x2, min. spacing is exceeded at a science room, light fixture obstruction at a storage room, one overspaced head off an adjacent wall in classroom J10, need to verify correct temp. heads at the room marked "kiln room". Concluded inspection until repairs are made and project is ready for field review.
FIR06-00595 INSP-Final Inspection7/21/20087/22/20087/22/2008 4:01:06 PMAPART
Final pending fire hat at elevators, per contractor the supervisory tamper switch at the 5th floor NE riser has been repaired and correctly programed-will verify at final inspection in conjunction with elevator controls as discussed.
FIR08-00289 INSP-Sprinkler Rough-in7/22/20087/22/20087/22/2008 1:29:27 PMPPART
Site visit to verify seismic restraint at beam clamps for system piping hangers prior to structural fireproofing throughout.
FIR08-00210 INSP-Sprinkler Rough-in/Hydro7/21/20087/22/20087/22/2008 12:58:55 PMPPART
OH hydrostatic retest passed.
MIS08-00110 FIR-Conference7/22/20087/22/20087/22/2008 12:40:20 PMPDONE
Work does not appear pertaining to fire alarm, fire sprinkler or fire life safety review.
BLD08-01322 FIRE-Final Inspection7/22/20087/22/20087/22/2008 12:09:43 PMPFAIL
Need to provide a current annual certification for the posted fire extinguisher, remainder of life safety is acceptable.
FIR08-00452 INSP-Sprinkler Rough-in7/21/20087/22/20087/22/2008 10:51:13 AMAFAIL
Field installation does not match approved plans including layout at the east side rooms, added head due to ceiling height change at the west side, contractor has installed 3/4 pendent heads despite approved drawings indicating 1/2 to be used, also lacking coverage for exposed combustible construction above the drop ceiling, corner adjacent to the south exit door is unprotected, provide accurate drawings prior to next inspection, ceiling cover is not approved at this time.
BLD08-01556 FIRE-Final Inspection7/21/20087/22/20087/22/2008 10:15:27 AMAPASS
Life safety inspection completed acceptable, inspection passed.
BLD06-02930 FIRE-Final Inspection7/21/20087/22/20087/21/2008 8:00:42 AMACANC
Life Safety final Phone #: ###-#### Internet Inspection Request from: Wayne Berry Inspection cancelled from web by: Wayne Berry