BLD06-02303
| BLD-Framing/Rough-in | 7/21/2008 | 7/22/2008 | 7/23/2008 5:37:18 PM | P | PART |
|
|
brad Phone #: ###-#### need puddy pads on both side of walls
|
BLD08-01471
| BLD-Conference | 7/21/2008 | 7/22/2008 | 7/23/2008 6:48:32 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Jeff Ware had to redesign deck becouse of bad soil next to house nrw design look ok
|
BLD06-01451
| BLD-Framing/Rough-in | 7/22/2008 | 7/22/2008 | 7/23/2008 6:46:19 AM | P | PART |
|
|
Dave; Could we get the holdowns inspected so we can finish up the shear ply?
Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin checked hold dowms all in place ok to cover two sided shear walls also looked at roof sheeting nailing and straping ok
|
BLD06-02762
| BLD-Conference | 7/21/2008 | 7/22/2008 | 7/22/2008 1:18:45 PM | A | PART |
|
|
This is for the two hr. duct wrap Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover this is the part from the stair tower ceiling to the roof
|
BLD07-00813
| BLD-Final | 7/21/2008 | 7/22/2008 | 7/22/2008 1:17:29 PM | A | PASS |
|
|
Daryl Phone #: ###-####
|
BLD07-00813
| DOC - Permit Finaled | 7/22/2008 | 7/22/2008 | 7/22/2008 1:17:21 PM | P | PASS |
|
|
|
BLD07-03118
| BLD-Energy code compliance | 7/22/2008 | 7/22/2008 | 7/22/2008 1:16:08 PM | P | PASS |
|
|
David Phone #: ###-#### ok to cover all but for area that mec needs to see ok to cover that after mec oks r/i
|
BLD08-00789
| BLD-Foundation | 7/21/2008 | 7/22/2008 | 7/22/2008 9:26:52 AM | A | PASS |
|
|
tom - stem wall Phone #: ###-####
|
BLD08-00364
| BLD-Footing | 7/21/2008 | 7/22/2008 | 7/22/2008 9:08:40 AM | A | PASS |
|
|
richard - pouring concrete at 11:30 am Phone #: ###-####
|