BLD06-00363
| BLD-Conference | 7/17/2009 | 7/20/2009 | | A | |
|
|
Carrie-Ada County Assessor office-what is going on with this permit??? Phone #: ###-####
|
BLD09-01128
| BLD-Framing/Rough-in | 7/21/2009 | 7/22/2009 | 7/22/2009 4:32:16 PM | P | PASS |
|
|
keith Phone #: ###-####. Framing for hardlid.
|
ESC09-00311
| Site Preparation | 7/22/2009 | 7/22/2009 | 7/22/2009 2:54:11 PM | P | PASS |
|
|
ESC permit sign posted. All BMP's in place. Also noted conc. washout in place. Excavated material on site is being hauled today as per contractor.
|
BLD09-00856
| BLD-Footing | 7/22/2009 | 7/22/2009 | 7/22/2009 2:52:45 PM | P | PASS |
|
|
Paul Phone #: ###-####. footing ok.
|
BLD09-00788
| BLD-Conference | 7/22/2009 | 7/22/2009 | 7/22/2009 2:18:36 PM | P | PASS |
|
|
thomas or ###-#### joe-verify if tied into existing house correctly please Phone #: ###-####
|
ESC09-00285
| Random Inspection | 7/22/2009 | 7/22/2009 | 7/22/2009 2:18:25 PM | P | PASS |
|
|
|
BLD09-01171
| BLD-Final | 7/22/2009 | 7/22/2009 | 7/22/2009 2:18:06 PM | P | FAIL |
|
|
Jeff Phone #: ###-####. Needs to get 1st. floor plan and pull permits for server room that was built with no permits.
|
ESC09-00329
| Random Inspection | 7/22/2009 | 7/22/2009 | 7/22/2009 10:57:50 AM | A | PASS |
|
|
|
BLD09-00896
| BLD-Framing/Rough-in | 7/21/2009 | 7/22/2009 | 7/22/2009 10:50:16 AM | A | PASS |
|
|
Dave Phone #: ###-####. ok to insul.
|
BLD09-01045
| BLD-Framing/Rough-in | 7/21/2009 | 7/22/2009 | 7/22/2009 10:27:13 AM | A | PASS |
|
|
jim Phone #: ###-####. Framing ok. NOted to contractor to get new size window approved on norht elevation prior to final.
|