Inspections for the day of: Wednesday, July 22, 2009.
Number of inspections: 10
Percentage of inspections complete: 90 %
Percentage of inspections not complete: 10 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-00363 BLD-Conference7/17/20097/20/2009 A 
Carrie-Ada County Assessor office-what is going on with this permit??? Phone #: ###-####
BLD09-01128 BLD-Framing/Rough-in7/21/20097/22/20097/22/2009 4:32:16 PMPPASS
keith Phone #: ###-####. Framing for hardlid.
ESC09-00311 Site Preparation7/22/20097/22/20097/22/2009 2:54:11 PMPPASS
ESC permit sign posted. All BMP's in place. Also noted conc. washout in place. Excavated material on site is being hauled today as per contractor.
BLD09-00856 BLD-Footing7/22/20097/22/20097/22/2009 2:52:45 PMPPASS
Paul Phone #: ###-####. footing ok.
BLD09-00788 BLD-Conference7/22/20097/22/20097/22/2009 2:18:36 PMPPASS
thomas or ###-#### joe-verify if tied into existing house correctly please Phone #: ###-####
ESC09-00285 Random Inspection7/22/20097/22/20097/22/2009 2:18:25 PMPPASS
BLD09-01171 BLD-Final7/22/20097/22/20097/22/2009 2:18:06 PMPFAIL
Jeff Phone #: ###-####. Needs to get 1st. floor plan and pull permits for server room that was built with no permits.
ESC09-00329 Random Inspection7/22/20097/22/20097/22/2009 10:57:50 AMAPASS
BLD09-00896 BLD-Framing/Rough-in7/21/20097/22/20097/22/2009 10:50:16 AMAPASS
Dave Phone #: ###-####. ok to insul.
BLD09-01045 BLD-Framing/Rough-in7/21/20097/22/20097/22/2009 10:27:13 AMAPASS
jim Phone #: ###-####. Framing ok. NOted to contractor to get new size window approved on norht elevation prior to final.