ESC10-00542
| Site Preparation ESC | 7/22/2010 | 7/22/2010 | 7/22/2010 2:31:42 PM | | NR |
|
|
Work has not started. Left message for RP (Dan) for him to contact SGW with estimated start date.
|
ESC10-00437
| Random Inspection | 7/22/2010 | 7/22/2010 | 7/22/2010 1:28:11 PM | P | FAIL |
|
|
Verbal, re-inspection will take place on 7/26
|
ESC10-00434
| Random Inspection | 7/22/2010 | 7/22/2010 | 7/22/2010 1:27:03 PM | P | FAIL |
|
|
Verbal, re-inspection will take place on 7/26
|
ESC10-00435
| Random Inspection | 7/22/2010 | 7/22/2010 | 7/22/2010 1:25:34 PM | P | FAIL |
|
|
Verbal, re-inspection will take place on 7/26
|
ESC10-00438
| Site Preparation | 7/22/2010 | 7/22/2010 | 7/22/2010 1:24:51 PM | P | FAIL |
|
|
Verbal, re-inspection will take place on 7/26
|
ESC10-00523
| Site Preparation | 7/22/2010 | 7/22/2010 | 7/22/2010 9:32:34 AM | A | NR |
|
|
|
ESC10-00523
| Conference | 7/22/2010 | 7/22/2010 | 7/22/2010 9:32:16 AM | A | DONE |
|
|
Reviewed site with inspector 460 and RP, (Anthony). Reviewed scope of work and provided comments for compliance, including the need to file the NOI and inspection requirements under the CGP. Site Preparation inspection will be performed in one week by inspector 460.
|
ESC10-00455
| Site Preparation | 7/22/2010 | 7/22/2010 | 7/22/2010 7:51:45 AM | | CANC |
|
|
Inspector 425 passed on 7-21
|