FIR11-00342
| INSP-Sprinkler Rough-in | 7/22/2011 | 7/22/2011 | 7/22/2011 6:50:03 PM | P | PART |
|
|
|
FIR10-00583
| INSP-Sprinkler Rough-in | 7/22/2011 | 7/22/2011 | 7/22/2011 6:39:39 PM | P | NR |
|
|
|
FIR11-00326
| INSP-Final Inspection | 7/21/2011 | 7/22/2011 | 7/22/2011 6:39:03 PM | P | PASS |
|
|
Fire alarm work passed inspection. Scope of work completed, permit finaled.
|
FIR11-00282
| INSP-Final Inspection | 7/21/2011 | 7/22/2011 | 7/22/2011 6:35:22 PM | A | PASS |
|
|
Fire sprinkler permit approved for final status.
|
FIR11-00317
| INSP-Final Inspection | 7/21/2011 | 7/22/2011 | 7/22/2011 12:36:13 PM | A | FAIL |
|
|
Power to the fryer appliance failed to shunt upon suppression system activation.
|
BLD11-00949
| FIRE-Final Inspection | 7/21/2011 | 7/22/2011 | 7/22/2011 12:34:19 PM | A | PASS |
|
|
Fire life safety finaled.
|
FIR11-00266
| INSP-Final Inspection | 7/22/2011 | 7/22/2011 | 7/22/2011 12:33:23 PM | P | PASS |
|
|
Fire sprinkler permit finaled. C/N items verified. Note: Per contractor survey, head count in this building is 97.
|
FIR11-00261
| INSP-Final Inspection | 7/21/2011 | 7/22/2011 | 7/22/2011 12:31:02 PM | A | PASS |
|
|
Hood suppression system operated correctly under test conditions. Inspection passed, permit finaled.
|
FIR10-00583
| INSP-Sprinkler Rough-in | 7/21/2011 | 7/22/2011 | 7/21/2011 3:44:53 PM | A | PART |
|
|
Requesting a rough-to-cover inspection to reconfirm the previous deficiencies in the admin & kitchen areas. Please call Miguel at ###-#### to schedule inspection time. Phone #: ###-#### >> Inspection requested via web by Trent Bice *Previous C/N items verified for completion- still missing seismic brace per plan at the gym. Discussed obstruction, signage and location at the FDC. Inspection completed 7/21 per contractor request.
|