Inspections for the day of: Friday, July 22, 2011.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00342 INSP-Sprinkler Rough-in7/22/20117/22/20117/22/2011 6:50:03 PMPPART
FIR10-00583 INSP-Sprinkler Rough-in7/22/20117/22/20117/22/2011 6:39:39 PMPNR
FIR11-00326 INSP-Final Inspection7/21/20117/22/20117/22/2011 6:39:03 PMPPASS
Fire alarm work passed inspection. Scope of work completed, permit finaled.
FIR11-00282 INSP-Final Inspection7/21/20117/22/20117/22/2011 6:35:22 PMAPASS
Fire sprinkler permit approved for final status.
FIR11-00317 INSP-Final Inspection7/21/20117/22/20117/22/2011 12:36:13 PMAFAIL
Power to the fryer appliance failed to shunt upon suppression system activation.
BLD11-00949 FIRE-Final Inspection7/21/20117/22/20117/22/2011 12:34:19 PMAPASS
Fire life safety finaled.
FIR11-00266 INSP-Final Inspection7/22/20117/22/20117/22/2011 12:33:23 PMPPASS
Fire sprinkler permit finaled. C/N items verified. Note: Per contractor survey, head count in this building is 97.
FIR11-00261 INSP-Final Inspection7/21/20117/22/20117/22/2011 12:31:02 PMAPASS
Hood suppression system operated correctly under test conditions. Inspection passed, permit finaled.
FIR10-00583 INSP-Sprinkler Rough-in7/21/20117/22/20117/21/2011 3:44:53 PMAPART
Requesting a rough-to-cover inspection to reconfirm the previous deficiencies in the admin & kitchen areas. Please call Miguel at ###-#### to schedule inspection time. Phone #: ###-#### >> Inspection requested via web by Trent Bice *Previous C/N items verified for completion- still missing seismic brace per plan at the gym. Discussed obstruction, signage and location at the FDC. Inspection completed 7/21 per contractor request.