BLD13-01677
| FIRE-Conference | 7/12/2013 | 7/22/2013 | 7/24/2013 3:45:25 PM | A | PASS |
|
|
Susan has removed the old lights.
|
FIR13-00147
| INSP-Final Inspection | 7/22/2013 | 7/22/2013 | 7/22/2013 4:11:26 PM | P | PASS |
|
|
Permit finaled
|
BLD13-01802
| FIRE-Final Inspection | 7/22/2013 | 7/22/2013 | 7/22/2013 3:53:31 PM | P | PASS |
|
|
Life safety passed. Owner to remove the thumbturn deadbolt from the main exit and install keyed as per the approved drawings prior to the building inspection.. I let the owner know that the building inspector may require lever hardware on the restroom door based on a plan review note from a previous tenant remodel.
|
FIR12-00695
| INSP-Sprinkler Rough-in | 7/22/2013 | 7/22/2013 | 7/22/2013 3:50:39 PM | P | CANC |
|
|
Cancelled due to being over booked. Rescheduled for tomorrow.
|
FIR12-00551
| INSP-Final Inspection | 7/18/2013 | 7/22/2013 | 7/22/2013 3:45:20 PM | A | PASS |
|
|
permit finaled
|
BLD13-01431
| FIRE-Final Inspection | 7/22/2013 | 7/22/2013 | 7/22/2013 2:47:06 PM | P | PASS |
|
|
Life safety passed. Contractor chose to install passage hardware on the access door to the island restrooms.
|
BLD13-01913
| FIRE-Final Inspection | 7/22/2013 | 7/22/2013 | 7/22/2013 2:40:18 PM | P | FAIL |
|
|
Shay and I spoke with Carl Madson and determined that an updated floor plan needs to be submitted that shows the island restroom, small enclosed corridor and the separate business in suite 102. The fire extinguisher has been inspected.
|
FIR13-00115
| INSP-Sprinkler Rough-in | 7/22/2013 | 7/22/2013 | 7/22/2013 2:13:45 PM | P | PASS |
|
|
See the city approved plans for additional rooms marked "ok" in red where the sprinkler piping is ok to cover.
|
FIR13-00292
| INSP-Final Inspection | 7/17/2013 | 7/22/2013 | 7/22/2013 2:04:51 PM | P | PASS |
|
|
Permit finaled. Netcon was a 5
|
FIR13-00148
| INSP-Final Inspection | 7/22/2013 | 7/22/2013 | 7/22/2013 1:49:04 PM | P | CANC |
|
|
Would like to perform this inspection in conjunction with alarm testing. Please call Brad Bettencourt at the office if there are any issues or questions. Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Brad Bettencourt
|
FIR13-00095
| INSP-Sprinkler Rough-in/Hydro | 7/19/2013 | 7/22/2013 | 7/22/2013 10:25:34 AM | A | PASS |
|
|
Overhead hydro test passed. I noted that the fire dept connection has not been installed on the street side of the building. I spoke with Don and he is going to contact Tim Frost to verify an approved location for the fdc and the electric alarm bell.
|
FIR13-00095
| INSP-Supply line flush | 7/19/2013 | 7/22/2013 | 7/22/2013 10:23:30 AM | A | CANC |
|
|
Cancel per Don Phone #: ###-####
|
BLD13-01657
| FIRE-Final Inspection | 7/19/2013 | 7/22/2013 | 7/22/2013 10:03:57 AM | A | FAIL |
|
|
Repair the rear exit sign and remove the thumbturn lock or remove the exit sign (not required) and the lock can remain since the space only requires one exit. Also sprinkler coverage is missing in the rear/east room. This work will require a separate permit.
|
BLD13-00821
| FIRE-Conference | 7/18/2013 | 7/22/2013 | 7/22/2013 10:00:48 AM | P | DONE |
|
|
Forest, the info you had requested is as follows: TVFP did the cetification, system 525 lbs. last date inspected 8-08-2008 Phone #: ###-#### >> Inspection requested via web by phil doble
|
BLD13-00882
| FIRE-Final Inspection | 7/19/2013 | 7/22/2013 | 7/22/2013 9:25:58 AM | A | FAIL |
|
|
Provide approved door hardware on doors as marked in red on plan sheet A3.1
|
FIR13-00255
| INSP-Final Inspection | 7/18/2013 | 7/22/2013 | 7/22/2013 8:33:07 AM | A | PART |
|
|
Dish washing area as marked on the city approved plans is ok for cover.
|
FIR13-00249
| INSP-Sprinkler Rough-in | 7/19/2013 | 7/22/2013 | 7/22/2013 7:04:39 AM | A | PASS |
|
|
Underground piping is approved to cover as marked on the city approved plans.
|
FIR13-00250
| INSP-Sprinkler Rough-in | 7/19/2013 | 7/22/2013 | 7/22/2013 7:04:13 AM | A | PASS |
|
|
Underground piping is approved to cover as marked on the city approved plans.
|