MIS14-00165
| BLD-Conference | 7/22/2014 | 7/22/2014 | 7/22/2014 12:00:00 AM | P | DONE |
|
|
Met with Scott the property maintanace manager ###-#### and reviewed water leakage at and below unitr 707. A correction notice was issued for; corridor wall construction must be maintaned behind shower wall. Both bathrooms shall be watertight at showers, tubs and fixtures. Through penetrations (piping) of floor/ceiling assemblies must be firestopped.
|