Inspections for the day of: Tuesday, July 22, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-03369 FIRE-Conference7/22/20147/22/20147/23/2014 3:12:05 PMPDONE
Matt Forester Phone #: ###-####

Per discussion with Tim Frost and Romeo Gervais the "end gap" of the new ceiling assemble at the windows will be allowed without a requirement to "box-in" the ends.

Per conversation with Romeo Gervais the limited existing ceiling tile, installed above the conduit and wire mold, will be allowed to remain.
BLD14-00895 FIRE-Final Inspection7/22/20147/22/20147/22/2014 3:02:43 PMPFAIL
Need the project related fire alarm work completed for the second floor. Need small documents and the exit signs/emergency lights repaired in the existing corridor system.
FIR14-00438 INSP-Final Inspection7/21/20147/22/20147/22/2014 3:01:35 PMAFAIL
Todays testing was for the second floor only. All devices function correctly except a new NAC panel has been installed on the second floor and the new audio devices do not sync with the existing audio devices. Per myself and Lee's conversation with the contractors, plan modifications are required prior to a final sign off for the entire project but the sync issue needs to be addressed prior to second floor occupancy. All fire alarm devices were to function correctly as per phone/email conversation with the fire alarm contractor dated 7/7/2014.
FIR14-00461 INSP-Sprinkler Rough-in7/22/20147/22/20147/22/2014 1:53:09 PMPPASS
The underground supply is ok to cover.
FIR14-00463 INSP-Sprinkler Rough-in7/22/20147/22/20147/22/2014 1:52:45 PMPPASS
Underground supply ok to cover,
FIR13-00723 INSP-Sprinkler Rough-in7/21/20147/22/20147/22/2014 11:44:22 AMAPASS
2" overhead lines have been changed out to the previously approved 2 1/2". Hardlids ok to install as marked on the plans.
BLD14-01471 FIRE-Final Inspection7/21/20147/22/20147/22/2014 11:41:20 AMAPASS
life safety passed
FIR14-00137 INSP-Sprinkler Rough-in7/21/20147/22/20147/22/2014 11:31:43 AMAPASS
See the city approved plans for location where piping can be covered