FIR15-00143
| INSP-Sprinkler Rough-in | 7/22/2015 | 7/22/2015 | 7/22/2015 3:04:50 PM | P | PASS |
|
|
Rough-in for the first and second floor office areas passed. Resubmittals will be needed due to routing changes for the main and extended coverage sidewalls. Also will need protection provided under the tanks.
|
BLD15-01513
| FIRE-Final Inspection | 7/22/2015 | 7/22/2015 | 7/22/2015 2:44:41 PM | P | FAIL |
|
|
Need city approved plans on site for inspection
|
FIR15-00353
| INSP-Sprinkler Rough-in | 7/22/2015 | 7/22/2015 | 7/22/2015 1:53:09 PM | P | PASS |
|
|
Rough-in and tenting inspection passed. Piping can be covered.
|
BLD15-00708
| FIRE-Final Inspection | 7/22/2015 | 7/22/2015 | 7/22/2015 1:51:23 PM | P | PASS |
|
|
Life safety passed
|
BLD15-02240
| FIRE-Final Inspection | 7/20/2015 | 7/22/2015 | 7/22/2015 9:36:02 AM | A | FAIL |
|
|
Provide fire extinguisher as discussed.
|
BLD15-02271
| FIRE-Final Inspection | 7/22/2015 | 7/22/2015 | 7/22/2015 9:30:20 AM | P | PASS |
|
|
life safety passed
|
FIR15-00353
| INSP-Sprinkler Rough-in | 7/21/2015 | 7/22/2015 | 7/22/2015 8:41:31 AM | A | CANC |
|
|
Colton Cox is the contact. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
BLD14-03283
| FIRE-Final Inspection | 7/21/2015 | 7/22/2015 | 7/22/2015 8:02:37 AM | A | PASS |
|
|
Life Safety passed. The panic hardware has not been installed on the south facing gate yet.
|
BLD15-02271
| FIRE-Final Inspection | 7/17/2015 | 7/22/2015 | 7/21/2015 10:46:53 AM | A | CANC |
|
|
To be rescheduled for tomorrow morning. Jason Phone #: ###-####
|