Inspections for the day of: Wednesday, July 22, 2015.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-01964 BLD-Final7/22/20157/22/20157/22/2015 4:40:45 PMPCANC
Joe Phone #: ###-####.Moved to am. inspection tomorrow.
BLD14-02418 BLD-Final7/22/20157/22/20157/22/2015 2:56:51 PMPFAIL
would like call ahead; Sydney Phone #: ###-####.. provide the required energy cert and post. Provide the blower door test result or the 3rd. party airseal inspection report and post. Also need to verify tempered glazing at front door. Correction notice posted.
BLD15-01555 BLD-Framing/Rough-in7/21/20157/22/20157/22/2015 2:55:02 PMPFAIL
Brett Phone #: ###-####. Complete lateral bracing on B5 and B6 trusses. Provide additional purlin on top chord of trusses at common wall of garage and house were roof sheathing has been held back. ok to insulate. Correction notice posted.
BLD14-03283 BLD-Final7/21/20157/22/20157/22/2015 11:09:50 AMAPASS
Pool Inspection Phone #: ###-#### Inspection requested via web by Tyler Hildebrand. Will be ok for perm occ. once zoning signs perm.
BLD15-02058 BLD-Foundation7/21/20157/22/20157/22/2015 10:16:37 AMAPART
Paul-wall-would like mid morning if poss Phone #: ###-####
ESC15-00048 Site Final7/22/20157/22/20157/22/2015 9:18:26 AMADONE
ESC15-00048 DOC - Permit Finaled7/22/20157/22/20157/22/2015 9:18:16 AMPPASS
BLD15-00175 BLD-Final7/22/20157/22/20157/22/2015 9:16:11 AMANR
key is in receptacle at front door Phone #: ###-#### Inspection requested via web by Paul Thompson. Install code compliant handrail.
BLD15-01703 BLD-Wall Bracing7/21/20157/22/20157/22/2015 8:53:07 AMAPASS
Kirby Phone #: ###-####