BLD14-01964
| BLD-Final | 7/22/2015 | 7/22/2015 | 7/22/2015 4:40:45 PM | P | CANC |
|
|
Joe Phone #: ###-####.Moved to am. inspection tomorrow.
|
BLD14-02418
| BLD-Final | 7/22/2015 | 7/22/2015 | 7/22/2015 2:56:51 PM | P | FAIL |
|
|
would like call ahead; Sydney Phone #: ###-####.. provide the required energy cert and post. Provide the blower door test result or the 3rd. party airseal inspection report and post. Also need to verify tempered glazing at front door. Correction notice posted.
|
BLD15-01555
| BLD-Framing/Rough-in | 7/21/2015 | 7/22/2015 | 7/22/2015 2:55:02 PM | P | FAIL |
|
|
Brett Phone #: ###-####. Complete lateral bracing on B5 and B6 trusses. Provide additional purlin on top chord of trusses at common wall of garage and house were roof sheathing has been held back. ok to insulate. Correction notice posted.
|
BLD14-03283
| BLD-Final | 7/21/2015 | 7/22/2015 | 7/22/2015 11:09:50 AM | A | PASS |
|
|
Pool Inspection Phone #: ###-#### Inspection requested via web by Tyler Hildebrand. Will be ok for perm occ. once zoning signs perm.
|
BLD15-02058
| BLD-Foundation | 7/21/2015 | 7/22/2015 | 7/22/2015 10:16:37 AM | A | PART |
|
|
Paul-wall-would like mid morning if poss Phone #: ###-####
|
ESC15-00048
| Site Final | 7/22/2015 | 7/22/2015 | 7/22/2015 9:18:26 AM | A | DONE |
|
|
|
ESC15-00048
| DOC - Permit Finaled | 7/22/2015 | 7/22/2015 | 7/22/2015 9:18:16 AM | P | PASS |
|
|
|
BLD15-00175
| BLD-Final | 7/22/2015 | 7/22/2015 | 7/22/2015 9:16:11 AM | A | NR |
|
|
key is in receptacle at front door Phone #: ###-#### Inspection requested via web by Paul Thompson. Install code compliant handrail.
|
BLD15-01703
| BLD-Wall Bracing | 7/21/2015 | 7/22/2015 | 7/22/2015 8:53:07 AM | A | PASS |
|
|
Kirby Phone #: ###-####
|